Optimasi waktu proyek konstruksi dengan penambahan jam kerja menggunakan metode crashing (Studi kasus : Proyek pembangunan gedung pusat terpadu RSUD Sidoarjo)

Authors

  • Zudan Arif Fakhrulloh Universitas 17 Agustus 1945
  • Masca Indra Triana Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.31004/jutin.v8i1.38965

Keywords:

Crashing Method, Construction Project, Overtime, Project Delays, Cost

Abstract

In implementing construction projects, the benchmark for project success can be seen from short and timely completion times with minimal costs without forgetting the quality of the work. This study aims to identify the optimal time and cost for the project. The research was conducted on the construction of the Sidoarjo Regional Hospital's Integrated Central Building, which has a target completion time of 194 calendar days and is planned to be finished within 28 weeks. Field data revealed a delay of 5.06% between the 7th and 10th weeks, with actual progress reaching 8.80% compared to the planned 13.86%. These delays negatively impacted the quality of work. To address this issue, an acceleration method (crashing) was applied, using the alternative of extended working hours (overtime) with variations of 1 hour, 2 hours, and 3 hours. The research findings indicated that the optimal overtime increase is 3 hours, reducing the project duration from 194 days to 181 days, an acceleration of 13 days. The total project cost was calculated at Rp. 62,632,208,400.99, reflecting a cost reduction of Rp. 159.417.559,01 compared to the normal cost of Rp. 62,791,626,000.00

References

Ana Dwi Rahayu, F., & Heri Zulfiar, M. (2020). PERCEPATAN JADWAL MENGGUNAKAN SISTEM LEMBUR DENGAN PRECEDENCE DIAGRAMMING METHOD (STUDI KASUS?: PROYEK PEMBANGUNAN BENDUNGAN PIDEKSO YANG TERLETAK DI KABUPATEN WONOGIRI PROVINSI JAWA TENGAH). Universitas Muhamammadiyah Yogyakarta.

Ananda, R., & Mulyani, E. (2021). ANALISIS KETERLAMBATAN DAN KUALITAS HASIL PEKERJAAN PADA PROYEK KONSTRUKSI GEDUNG. Jurnal PWK, Laut, Sipil, Tambang, 8(1). https://doi.org/https://dx.doi.org/10.26418/jelast.v8i1.46036

Budianto, E. A., & Husin, A. E. (2021). Analisis Optimasi Waktu dan Biaya Dengan Metode Time Cost Trade Off pada Proyek Gudang Amunisi. Jurnal Aplikasi Teknik Sipil, 19(3).

Buya, M., Ashad, H., & Watono. (2022). Analisis Faktor Keterlambatan Waktu Pelaksanaan Konstruksi Pada Pembagunan Kantor Bupati Pulau Taliabu Dengan Metode Analytic Hierarchy Process. Jurnal Konstruksi?: Teknik , Infrastruktur Dan Sains, 1(1), 44–53.

Elita Saragi, T., & Uli Situmorang, R. A. (2022). OPTIMASI WAKTU DAN BIAYA PERCEPATAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF DENGAN ALTERNATIF PENAMBAHAN TENAGA KERJA DAN JAM KERJA (LEMBUR) (Studi Kasus?: Pembangunan Gedung Convention Hall Kab. Deli Serdang). Jurnal Teknik Sipil, 1(2).

Fikri Miranda Djau Tisano Tj Arsjad, M., & Inkiriwang, R. L. (2021). PERCEPATAN PELAKSANAAN PROYEK DENGAN PENAMBAHAN TENAGA KERJA PADA PEMBANGUNAN RUKO DI JALAN BUKIT MORIA, TIKALA BARU. Jurnal Sipil Statik, 9(4), 709–716.

Rompis Michelle, A. O., Ingkiriwang, R. L., & Sibi, M. (2019). OPTIMASI WAKTU PROYEK DENGAN PENAMBAHAN JAM KERJA MENGGUNAKAN PRECEDENCE DIAGRAM METHOD PADA PROYEK REHABILITASI PUSKESMAS MINANGA. Jurnal Sipil Statik, 7(9), 1203–1210.

Usman, S., Muhammad, A. H., Adjam, I., Kom, M., & Altarans, I. (2023). OPTIMASI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA DAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus: Proyek Pembangunan Gedung Islamic Center Halmahera Tengah). Jurnal Teknik, 16(1), 17–31. www.jurnal.ummu.ac.id/dintek

Wilson Simanungkalit, A., Lubis, M., & Simbolon, R. H. (2022). EVALUASI PENJADWALAN PROYEK DENGAN MENGGUNAKAN METODE CPM ( CRITICAL PATH METHODE) PADA PROYEK PEMBANGUNAN MALL SUZUYA JLN.KARYA WISATA MEDAN JOHOR. Cetak) Buletin Utama Teknik, 18(1), 1410–4520.

Witjaksana, B., Ratnawati, T., & Abdul Rahim, M. (2019). Activity Based Management Change Order Model-Based Economic Value Added Through The Effectiveness And Efficiency To Improve The Financial Performance Of Building Construction Projects In Surabaya City. Archives of Business Research, 7(2), 153–170. https://doi.org/10.14738/abr.72.6201

Downloads

Published

2025-01-13

How to Cite

Fakhrulloh , Z. A., & Triana, M. I. (2025). Optimasi waktu proyek konstruksi dengan penambahan jam kerja menggunakan metode crashing (Studi kasus : Proyek pembangunan gedung pusat terpadu RSUD Sidoarjo). Jurnal Teknik Industri Terintegrasi (JUTIN), 8(1), 112–124. https://doi.org/10.31004/jutin.v8i1.38965