Analisis penerapan Kesehatan dan Keselamatan Kerja (K3) dalam proyek pembangunan Gedung RSIA Norfa Husada

Authors

  • Hanantatur Adeswastoto Universitas Pahlawan Tuanku Tambusai
  • Resy Kumala Sari Universitas Pahlawan Tuanku Tambusai
  • M Azlan Saputra Universitas Pahlawan Tuanku Tambusai
  • Tasya Tasya Universitas Pahlawan Tuanku Tambusai
  • Khoirun Nisa Universitas Pahlawan Tuanku Tambusai
  • Anang Maulana Ar Rahman Universitas Pahlawan Tuanku Tambusai

Keywords:

Occupational Safety and Health Risks (K3), Management, Construction

Abstract

Norfa Husada Hospital is a multi-storey building construction project that has K3 risks during construction. Therefore, to reduce the number of work accidents that occur during the Norfa Husada-Bangkinang Hospital Building construction project, efforts are needed to identify potential risks of work accidents from each job. This research studies various factors that influence occupational safety and health, how to implement occupational safety and health, and occupational safety and health risks. The aim of this research is to determine the types of risks, the factors that influence them, and how to manage occupational safety and health risks in the Norfa Husada Bangkinang hospital building construction project. The data collection method used in this research was a questionnaire and interview method with 20 respondents consisting of Owners, Contractors, Supervisors. The results of this research obtained a score of 3.3% for workers' comfort and light sources while working, a score of 2.75% because the machine was located far from the project environment, causing injuries or noise, a score of 3.25% for the company that provided a comfortable place to rest, a score of 2.80% for a spacious workplace so that it did not cause clashes with other workers, and a score of 3.30% for the presence of personal protective equipment (PPE) provided on the project.

References

Adeswastoto,H. (2022). Evaluasi Penerapan Sistem Keselamatan Kebakaran Pada Gedung Pondok Pesantren Daarun Nahdhah Thawalib Kecamatan Bangkinang. Jurnal ArTsip, 05(01),28-37. Retrieved from https://journal.universitaspahlawan.ac.id/index.php/artsip/article/view/17070

Anggrayni, I. N., & Beatrix, M. (2024). Evaluasi Faktor Yang Mempengaruhi Penerapan Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Gedung Smpn 9 Kota Kediri–Jawa Timur. Journal of Scientech Research and Development, 6(1), 571-579.

Latupeirissa, J. E., & Tiyouw, H. C. P. (2023). Analisis Tingkat Pengetahuan Pekerja Terhadap Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Rumah Sakit Mata Makassar. Paulus Civil Engineering Journal, 5(3), 516-524.

Lubis, D. S. (2018). Hubungan Pengetahuan Ibu Dengan Riwayat Persalinan Sectio Caesarea (SC) Di RSIA Norfa Husada Bangkinang Tahun 2018. Jurnal Doppler, 2(2).

Munasir, U. F., & Renaningsih, R. (2023, May). Manajemen Waktu pada Struktur Bawah Proyek Pembangunan Rumah Sakit Kasih Ibu Surakarta. In Prosiding Seminar Nasional Teknik Sipil UMS (pp. 699-704).

Najihah, K., Moriza, T., & Laia, P. (2023). Penerapan Pelatihan K3 Dan Implikasinya Terhadap Kejadian Kecelakaan Kerja pada Proyek Pembangunan Rumah Sakit. Indonesian Journal of Public Health, 1(1), 48-53.

Oktaviani, D. A., Carlo, N., & Khadavi, K. Penerapan Sistem Manajemen K3 Pada Proyek Rumah Sakit Universitas Andalas Padang. Abstract of Undergraduate Research, Faculty of Civil and Planning Engineering, Bung Hatta University, 1(2).

Pandeiroth, Y., Kawet, R., & Roring, R. F. (2023). Analisis Penerapan Manajemen Waktu Pada Proyek Konstruksi Bangunan Gedung Rumah Sakit Umum Dr. Sam Ratulangi Tondano. Gearbox: Jurnal Pendidikan Teknik Mesin, 4(2), 192-200.

Rawis, T. D., Tjakra, J., & Arsjad, T. T. (2016). Perencanaan Biaya Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Konstruksi Bangunan (Studi Kasus: Sekolah St. Ursula Kotamobagu). Jurnal Sipil Statik, 4(4).

Rianto, S. (2020). Analisa Perbandingan Biaya Menggunakan Metode SNI dan Metode Bow Beserta Perhitungan Waktu Dan Identifikasi SDM, Mutu, K3 Pada Gedung Kantor Graha UMKM di Kota Pontianak. JURNAL RETENSI, 1(1), 43-49.

Simatupang, O. (2016). Faktor-Faktor Yang Mempengaruhi Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Gedung Fmipa Unimed (Doctoral Dissertation, Unimed).

ST Khohar, A. Penerapan Manajemen Waktu Terhadap Penyelesaian Proyek Konstruksi, Studi Kasus: Pembangunan Gedung Pusat Layanan Stroke Rumah Sakit Umum Haji Surabaya 2020.

Tanijaya, J., & Lukman, M. (2024). Analisis Penerapan Keselamatan Dan Kesehatan Kerja (K3) Proyek Pembangunan Jembatan Wai Maskano.

Yusuf, M., & Wibowo, H. (2022). Evaluasi Penerapan Keselamatan dan Kesehatan Kerja (K3) Konstruksi Pada Proyek Pembangunan Rumah Sakit Mitra Siaga 2 Tarub Kabupaten Tegal. Engineering: Jurnal Bidang Teknik, 13(2), 1-10.

Yusuf, M. (2013). Hubungan Manajemen Waktu Perawat Pelaksana Dengan Pendokumentasian Asuhan Keperawatan Di Ruang Rawat Inap Kelas III Rumah Sakit Umum Daerah DR. Zainoel Abidin Tahun 2013. Jurnal Ilmu Keperawatan, 1(1).

Downloads

Published

2025-01-17

How to Cite

Adeswastoto, H., Sari, R. K., Saputra, M. A., Tasya, T., Nisa, K., & Rahman, A. M. A. (2025). Analisis penerapan Kesehatan dan Keselamatan Kerja (K3) dalam proyek pembangunan Gedung RSIA Norfa Husada. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(1), 1525–1531. Retrieved from https://journal.universitaspahlawan.ac.id/index.php/jutin/article/view/42431

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>