Analisis Beban Kerja dan Kebutuhan Tenaga Kerja pada lini Produksi Lemari Kaca dengan Pendekatan Work Load Analysis (WLA)
DOI:
https://doi.org/10.31004/jutin.v9i1.52438Keywords:
Work load Analysis (WLA), Workload, Labor requirement, Heart Rate Reserve (HRR), Standard timeAbstract
The increasing demand for glass cabinets at CV. Nanda Jaya has intensified the workload on the production line, leading to inefficiencies such as delays in order completion and potential worker fatigue. This study aims to analyze workload and determine the optimal number of workers at each workstation using the Work-Load Analysis (WLA) method. Data collection was conducted through direct observation, work-time measurement, heart rate monitoring using the Heart Rate Reserve (HRR) method, and uniformity and adequacy tests. The results indicate an imbalance in workload distribution, with the assembly station recording the highest standard time of 126.60 seconds, making it the primary bottleneck in the production process.References
Adhitama, L. (2024). Pengukuran produktivitas dan analisis beban kerja menggunakan metode work sampling dan Defence Research Agency Workload Scale (DRAWS). (Skripsi/Thesis). Universitas Jenderal Soedirman.
International Labour Organization (ILO). (2019). Safety and health at the heart of the future of work: Building on 100 years of experience. International Labour Office.
Kusuma, A., & Riyanto, S. (2020). Analisis beban kerja dan penentuan jumlah karyawan menggunakan metode Work Load Analysis (WLA) dan Full Time Equivalent (FTE). Jurnal Manajemen dan Teknik Industri.
Munandar, A. S. (2019). Psikologi industri dan organisasi. Universitas Indonesia (UI-Press).
Putri, A. R., et al. (2022). Analisis beban kerja mental dan fisik menggunakan metode NASA-TLX dan CVL. Jurnal Teknik Industri.
Setiawan, D., et al. (2021). Pengukuran beban kerja fisik menggunakan metode Heart Rate Reserve (HRR) pada pekerja industri. Jurnal Ergonomi Indonesia.
Suryaningrat, I. B., Kuswardhani, N., & Hastuti, N. R. (2021). Optimalisasi beban kerja pada industri makanan menggunakan metode Workload Analysis (Studi kasus pada UD. MR-Jember). Jurnal Ilmiah Rekayasa Pertanian dan Biosistem, 9(2), 118–129.
Sutalaksana, I. Z., Anggawisastra, R., & Tjakraatmadja, J. H. (2016). Teknik perancangan sistem kerja. Penerbit ITB.
Wignjosoebroto, S. (2008). Ergonomi studi gerak dan waktu. Guna Widya.
Wijaya, H., & Rahman, A. (2021). Analisis beban kerja fisik dan mental pada operator produksi.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Deny Nur Alvianto, Jaka Purnama

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

