Analisis Optimalisasi Waktu Proses Kerja pada Divisi Welding Menggunakan Metode Jalur Kritis
DOI:
https://doi.org/10.31004/jutin.v9i1.52633Keywords:
Project Management, Production Process, Critical Path Method, Slack TimeAbstract
This study aims to analyze the optimization of work process time in the welding division using the Critical Path Method (CPM). This method is used to identify the critical path and calculate the slack variable for each production activity. The data used are the sequence of activities, dependency relationships, and production process time in 2024. The analysis process is carried out through the preparation of a network diagram, forward pass and backward pass calculations, and determining the slack value. The results show that the critical path is found in the series of activities A–B–C–D–E–F–G–H with a total duration of 17 minutes. All activities have a slack value of 0, so any delay has the potential to delay the entire process. These findings confirm that the production process in the welding division has been running optimally. The company is advised to maintain the existing work pattern and ensure the appropriate duration of each activity to maintain production efficiency.References
Akbar, Y. R. (2022). Penentuan Jalur Kritis untuk Manajemen Proyek ( Studi Kasus Pembangunan Jalan Selensen- Kota Baru- Bagan Jaya ). 2(2), 6–13.
Alman, A., Cohen, I., Gal, A., Maggi, F. M., & Montali, M. (2024). Discovering Process Framing for AI-Augmented BPM Systems in a Multi-Process Setting. 6896, 0–11.
Boffelli, A., Kalchschmidt, M., & Shtub, A. (2021). Simulation-Based Training : From a Traditional Course to Remote Learning - the COVID-19 Effect. 11(1), 8–17. https://doi.org/10.5539/hes.v11n1p8
Gumilar, G. (2023). Analisis Critical Path Model yang Digunakan Dalam Manajemen Proyek dan Kontribusinya Terhadap Manajemen Mutu ISO 9001 Critical Path Model Analysis Used in Project Management and Its Contribution to ISO. Jurnal Penelitian dan Pengkajian Sains dan Teknologi, 33(2), 16–25.
Heizer, J., & Rander, B. (2015). Manajemen Operasi: Manajemen Keberlangsungan dan Rantai Pasokan , Buku 1, Edisi 11. Jakarta : Salemba Empat.
Kerzner, B. H. (2022). The Connected Future Business Culture : The Great Project Management Accelerator The Reinvention of the Project Manager 1. XI(Xi), 1–11.
Kerzner, B. H. (2023). Building Program and Project Management Muscles : The Key to Excellent Operating Models 1 The Strategic Benefits of Good Project / Program Management _________. XII(Iii), 1–9.
Larson, E. W., & Gray, C. F. (2018). THE MANAGERIAL PROCESS 7E PROJECT (Seventh Ed). McGraw-Hill.
Melliya, Anggela, P., & Djanggu, N. H. (2023). Pengukuran Beban Kerja Fisik Dan Mental Dengan Metode Cvl, Brouha Dan Nasa-Tlx Pada Operator Spbu Pertamina 64.783.14. INTEGRATE: Industrial Engineering and Management System, 7(1), 95–100.
Nasrullah. (2024). TESIS MODEL PENGUKURAN MATURITY LEVEL K3 BERBASIS MODEL PENGUKURAN MATURITY LEVEL K3 BERBASIS. Tesis, 188.
PMI. (2021). A ide to the Project M n gement Bod of nowledge (Seventh Ed). Project Management Institute.
Pratama, N. F., & Lubis, K. (2025). Evaluasi Penerapan Manajemen Waktu pada Proyek Pembangunan Jembatan Pancurbatu Menggunakan Metode Critical Path Method ( CPM ). 17(1).
Puji, B., Samodra, D., Santoso, A., & Wardhana, E. M. (2025). Critical Chain Project Management and Buffer Planning : Study Case at Security Accommodation Vessel Construction. 10(1), 137–145.
Raranta, M. E., Manoppo, F. J., Malingkas, G. Y., Pascasarjana, P., & Ratulangi, U. S. (2020). Implementation of the Critical Path Method ( CPM ) in Web Applications for Project Scheduling with Python Programming. 1844–1854.
Tohari, H., & Suhasto, R. I. N. (2023). JURNAL AKSI Akuntansi dan Sistem Informasi. Jurnal Akuntansi dan Sistem Informasi, 8(2), 175–182.
Utari, R. P., Wahyudiono, S., Amal, A. S., & Ardian, L. (2025). G-Tech : Jurnal Teknologi Terapan Cost and Time Control Using The Earned Value Concept ( EVM ) Method : 9(4), 2229–2239.
Zunaidah, U., Qumairo, E. L., Nurhalizah, S., & Tambing, W. (2025). Enrichment : Journal of Management Application of project management using the critical path method ( CPM ) in residential construction projects. 15(2).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Indila Mayrosa, Harun Indra Kusuma, Dewi Rahmawati, Yulizan Rizki

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

