Penerapan Microsoft Project dalam Metode Crashing Terhadap Waktu dan Biaya

Authors

  • Muhammad Oka Mahendra Universitas Serang Raya
  • Teguh Eko Saputro Universitas Serang Raya
  • Al Fiillian Sah Putra Universitas Serang Raya

DOI:

https://doi.org/10.31004/jutin.v8i2.44080

Keywords:

Cost, Crashing, Microsoft Project, Overtime, Shift

Abstract

The PPLP Banten Building construction project experienced significant delays due to the extension of the implementation time, design revisions (shop drawings), and inaccurate material delivery. This study implemented a schedule compression strategy using Microsoft Project with two acceleration alternatives based on the AHSP standard. The crashing research method. The results of the study showed that the project duration was successfully shortened by 678 days with the 4-hour/day overtime alternative, while further work shift optimization reduced the duration to 530 days. Cost analysis showed differences between the two alternatives: with 4-hour/day overtime, the acceleration cost reached IDR3,066,675,000 (AHSP), while the work shift only cost IDR1,223,565,000 (AHSP). Comparison of cost slopes strengthened the advantages of work shifts: 4-hour/day overtime resulted in a cost slope of IDR193,067,245.23/day (AHSP), while the work shift only cost IDR33,638,199.58/day (AHSP). Evaluation of total costs (direct and indirect) also confirmed the efficiency of work shifts, with direct costs of Rp9,512,731,986.58 and indirect costs of Rp1,273,456,116.78, compared to 4 hours/day of overtime which required direct costs of Rp9,672,161,032.20 and indirect costs of Rp1,322,728,805.77.

References

Aryaduta, G., & Pulansari, F. (2025). Analisis Penjadwalan Percepatan Proyek Outfitting Machinery Blok ASA 2A S Pada Pembuatan Kapal A Menggunakan Microsoft Project dengan Precedence Diagram Method di PT . XYZ. Jurnal Serambi Engineering, X(1), 11835–11842.

Eko Samsudin, D. A., Andesta, D., & Ismiyah, E. (2021). Analisis Biaya Dan Waktu Proyek Pembangunan Perumahan Cerme Prisma Land Blok K Menggunakan Metode Pert Dan Evm (Studi Kasus: PT. Cahaya Prisma Utama). JUSTI (Jurnal Sistem Dan Teknik Industri), 2(1), 83. https://doi.org/10.30587/justicb.v2i1.3187

Faradisa, D. A., Setiawan, H., & Pongoh, F. M. (2024). Upaya Mengatasi Keterlambatan Bongkar Muat di Kapal MV . Ayer Mas. Journal of Nautical Science and Technology, 1(4), 24–30.

Jamaludin, M. (2023). Indonesia Investment Authority sebagai SWF Indonesia Untuk Meningkatkan Investasi Asing di Indonesia. ALADALAH: Jurnal Politik, Sosial, Hukum Dan Humaniora, 1(2), 283–301. https://doi.org/10.59246/aladalah.v1i2.364

Lala, A. N. T., Muis, M., Hamid, N., & Reni, A. (2024). Dampak Dimensi Kesejahteraan Karyawan Terhadap Hasil Kerja: Studi Integratif Tentang Keuangan, Karir, Dan Kesehatan. Nobel Management Review, 5(3), 321–332.

Lutfiani, N., Oganda, F. P., Agustin, F., Aini, Q., & Rahardja, U. (2020). Desain dan Metodologi Teknologi Blockchain Untuk Monitoring Manajemen Rantai Pasokan Makanan yang Terdesentralisasi. InfoTekJar : Jurnal Nasional Informatika Dan Teknologi Jaringan, 5(1), 18–25. https://jurnal.uisu.ac.id/index.php/infotekjar/article/view/2517/pdf

Porusia, M., Pristianto, A., Nabila, K. N., Hariadhi, D. N., Akhyar, M., & Siddiq, M. N. (2025). Pendampingan Kesehatan Jasmani Dan Rohani Terkait Work-Related Musculoskeletal Disorder Bagi Pekerja Migran Indonesia Di Kota Gimpo Korea Selatan. JMM (Jurnal Masyrakat Mandiri), 9(1), 13–26.

Probosiwi, R., & Putri, A. L. (2021). Jogo Tonggo : Solidaritas Masyarakat di Era Pandemi Covid-19. Jurnal Penelitian Dan Pengembangan Kesejahteraan Sosial, 10(2), 177–192. https://doi.org/10.33007/ska.v10i2.2423

Sianturi, N. M., Ira Modifa, & Krisna Deavid. (2022). Analisis Manajemen Waktu Konstruksi Pada Proyek Pembangunan 2 Gedung Nurse Station Covid-19. Jurnal Santeksipil, 3(1), 39–47. https://doi.org/10.36985/jsl.v3i1.529

Utami, G. W., & M.S.I, T. (2024). Perlindungan Nasabah Sebagai Konsumen Akibat Serangan Ciber. Journal Of Islamic Economic Law, 4(21), 1–15. https://doi.org/10.28918/elhisbah.v4i1.7581

Downloads

Published

2025-04-10

How to Cite

Mahendra, M. O., Saputro, T. E., & Putra, A. F. S. (2025). Penerapan Microsoft Project dalam Metode Crashing Terhadap Waktu dan Biaya. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(2), 1908–1918. https://doi.org/10.31004/jutin.v8i2.44080

Issue

Section

Articles of Research