Analisis Produktivitas Waktu dan Perbandingan Biaya Pekerjaan Tiang Pancang

Authors

  • Yudi Setio Prabowo Universitas Serang Raya
  • Andika Pratama Universitas Serang Raya
  • Al Fiillian Sah Putra Universitas Serang Raya

DOI:

https://doi.org/10.31004/jutin.v8i2.43965

Keywords:

Cost Comparison, Pile Foundations, Productivity, SNI 2022

Abstract

The advancement of technology continues to progress to meet society's need for efficiency and convenience in work, including improving time productivity in structural tasks such as pile foundation installation in construction projects. This research aims to analyze time efficiency and compare the field Budget Plan (RAB) costs with the SNI 2022 Budget Plan (RAB) costs for pile foundation installation. The study was conducted using unstructured interview methods with the site manager to gather primary data from the construction project of PT. Gudang Garam Tbk's cigarette depot building. A quantitative method was applied in this research.The analysis revealed that for the installation of 152 pile units, the highest time productivity was recorded at 0.384 m/min or 23,07 m/hour, the lowest at 0.192 m/min or 11,51 m/hour, and an average installation rate of 0.282 m/min or 16,95 m/hour. Additionally, this study also obtained a comparison between the field RAB (Budget Plan) costs and the SNI 2022 RAB costs. The field RAB cost for pile installation was Rp287,280,000,-. Meanwhile, the SNI 2022 RAB cost for pile installation was Rp441,663,676,-.

References

Afianty, S., & Rosdiana, Y. (2023). Pengaruh Budaya Organisasi dan Gaya Kepemimpinan terhadap Kinerja Karyawan. Bandung Conference Series: Accountancy, 3(2), 742–748. https://doi.org/10.29313/bcsa.v3i2.7534

Ariyanto, A. S., Kamila, K. A. P., Supriyadi, S., Utomo, M. B., & Mahmudi, W. L. (2019). Pengaruh Keterlambatan Material Terhadap Risiko Proyek Pembangunan Gedung Parkir. Bangun Rekaprima, 5(2), 51. https://doi.org/10.32497/bangunrekaprima.v5i2.1575

Dewi, N. D. T., & Budianto, E. W. H. (2022). Pemetaan Topik Penelitian seputar Pengaruh Variabel Mikroekonomi: Studi Bibliometrik VOSviewer dan Literature Review Nindi Dwi Tetria Dewi, Eka Wahyu Hestya Budianto Universitas Islam Negeri Maulana Malik Ibrahim Malang.

Fitrani Dwi Azzahra, M. P. T. A. (2024). Time Management: Strategies For A More Efficient Office Program Studi D4-Administrasi Bisnis/Jurusan Administrasi Niaga Politeknik Negeri Bandung. Jurnal Manajemen Bisnis Era Digital (JUMABEDI), 1(2), 187–203. https://doi.org/10.61132/jumabedi.v1i2.115

Haribowo, S. F. (2024). Analisis Pengaruh Financial Incentive Terhadap Produktivitas Kerja Karyawan Perusahaan Manufaktur di Indonesia : A Study Systematic Literature Review. 4(1), 523–533.

Hulu, D., Lahagu, A., & Telaumbanua, E. (2022). Analisis Lingkungan Kerja Dalam Meningkatkan Produktivitas Kerja Pegawai Kantor Kecamatan Botomuzoi Kabupaten Nias. Jurnal EMBA, 10(4), 1480–1496.

Hulu, S., Laian, I. E., Endayanti, M., & Napitupulu, J. (2022). Evaluasi Struktur Bawah Pada Proyek Pembangunan Rumah Susun Paspampres Jakarta Pusat. Jurnal Ilmiah Teknik Sipil, 11(1), 21. https://doi.org/10.46930/tekniksipil.v11i1.1698

Journal, C. D., Setiawan, B., Sistematis, P., Konstruksi, P., & Proyek, E. (2024). Change Processes Model Dengan Pendekatan. 5(5), 9633–9645.

Nurhendi, R. N., & Bastam, M. N. (2023). Faktor-faktor yang Mempengaruhi Produktivitas Tenaga Kerja Konstruksi: Tinjauan Literatur. Jurnal Teknik Sipil, 13(1), 53–65. https://doi.org/10.36546/tekniksipil.v13i1.965

Puspitasari, M., & Nursin, A. (2021). Analisis Produktivitas Alat Pancang Hydraulic Static Pile Driver Untuk Meningkatkan Kinerja Waktu Pada Proyek Apartemen Apple 3 Condovilla. Construction and Material Journal, 3(3), 207–217. https://doi.org/10.32722/cmj.v3i3.4162

Suradi, M., Badaruddin, S., Aziz, P., Widyasari, R., Ramdi, R. T. S., & Akbar, M. F. (2024). Analisis Perancangan Pondasi Tiang Pancang Menggunakan Software Plaxis (Studi Kasus : Proyek Pembangunan Gedung AMC RS Anutapura Palu). Journal of Applied Civil and Environmental Engineering, 4(1), 75–84. https://doi.org/10.31963/jacee.v4i1.4907

Warankiran, R. A. I., Dutolong, L. O. H., & Pandowo, M. H. C. (2021). Faktor - Faktor yang Mempengaruhi Produktivitas Kerja Karyawan Pada PT. Bank Sulutgo Cabang Utama di Manado. Jurnal EMBA: Jurnal Riset Ekonomi, Manajemen, Bisnis Dan Akuntansi, 9(4), 953–962.

Wilman Simanjuntak, & Kamaluddin Lubis. (2024). Analisis Daya Dukung Pondasi Tiang Pancang Pada Proyek Pembangunan Apartemen Princeton Boutique Living Medan. Jurnal Inersia, 15(2), 15–22. https://doi.org/10.46964/inersia.v15i2.905

Yosua, Julian, & Alifen, R. S. (2020). Analisis Operasional Pemancangan Jack-in Pile Dengan Model Simulasi Cyclone. Jurnal Teknik Sipil Universitas Kristen Petra, 252–258.

Yuliana, C., Hapsari, R., & Dewi, E. P. (2021). Analisis Perbandingan Efisiensi Alat Pancang Diesel Hammer Dan Drop Hammer Pada Pekerjaan Pondasi Tiang Pancang Di Lahan Basah (Comparative Analysis Of Efficiency Of Diesel Hammer And Drop Hammer Pieces On Pile Foundation Work In Wet Land). Jurnal Infrastruktur, 7(2), 87–92.

Downloads

Published

2025-04-10

How to Cite

Prabowo, Y. S., Pratama, A., & Putra, A. F. S. (2025). Analisis Produktivitas Waktu dan Perbandingan Biaya Pekerjaan Tiang Pancang . Jurnal Teknik Industri Terintegrasi (JUTIN), 8(2), 1855–1866. https://doi.org/10.31004/jutin.v8i2.43965

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 > >> 

You may also start an advanced similarity search for this article.