Analisis beban kerja pada pekerja Assembly Lavatory di PT INKA Multi Solusi dengan metode Workload Analysis (WLA)
DOI:
https://doi.org/10.31004/jutin.v8i1.39704Keywords:
Lavatory, Manufacture, Time study, Workload, Workload analysisAbstract
Lavatories are among the top items produced by INKA Multi Solusi, a manufacturing company that makes railway components. So the workload of workers needs to be considered, especially the assembly section because it rarely uses machine assistance with quite high demand. The time study approach was used to establish working hours, and workload analysis was used to determine the ideal workforce size. Three overload activities and two underload activities are identified based on the workload calculation. Meanwhile, the workload analysis results must be applied throughout the company to apply the ideal amount of workers., namely 2 people for installing partitions, 1 person for installing maulding, 2 people for piping, 2 people for installing closet sets, and 2 people for installing doors. Additionally, INKA Multi Solusi has established the right total number of employees based on the research.References
Agnesta, F. E., & Hasanah, K. (2023). Dampak Kepuasan Kerja Dilihat dari Job Description, Work Life Balance dan Penempatan Kerja (Studi Kasus Pada PT. INKA Multi Solusi Madiun). Jurnal Manajemen Dan Bisnis Indonesia, 9(2), 189–199. https://doi.org/10.32528/jmbi.v9i2.870
Anaam, I. K., Hidayat, T., Pranata, R. Y., Abdillah, H., & Putra, A. Y. W. (2022). Pengaruh Trend Otomasi Dalam Dunia Manufaktur dan Industri. Vocational Education National Seminar, 1(1), 46–50.
Fil’aini, R., Juanto, B., Attamimi, T. F., Valentino, F., Telaumbanua, M., Sari, T. N., & Mufidah, Z. (2024). Time and Workload Analysis to Determine Total Labor in the Arabica Coffee Harvesting Process. Applied Research in Science and Technology, 4(1), 1–10. https://doi.org/10.33292/areste.v4i1.50
Frahdiansari, A. P., Anang, C., & Khoirina, A. S. Al. (2024). Efisiensi Sumber Daya Manusia Dalam Pengelolaan Zakat dan Infaq: Pendekatan Dengan Metode Work Load Analisys (WLA) Dan Work Force Analysis (WFA). Jurnal Sains Dan Teknologi, 6(1), 9–18. https://doi.org/10.55338/saintek.v6i1.3125
Harahap, N. A. P., Al Qadri, F., Harahap, D. I. Y., Situmorang, M., & Wulandari, S. (2023). Analisis Perkkembangan Industri Manufaktur Indonesia. El-Mal: Jurnal Kajian Ekonomi & Bisnis Islam, 4(5), 1444–1450. https://doi.org/10.47467/elmal.v4i5.2918
Hutabarat, Y. (2017). Dasar Dasar Pengetahuan Ergonomi (Vol. 1). Media Nusa Creative. http://scioteca.caf.com/bitstream/handle/123456789/1091/RED2017-Eng-8ene.pdf?sequence=12&isAllowed=y%0Ahttp://dx.doi.org/10.1016/j.regsciurbeco.2008.06.005%0Ahttps://www.researchgate.net/publication/305320484_SISTEM_PEMBETUNGAN_TERPUSAT_STRATEGI_MELESTARI
Irawan, A., & Leksono, E. B. (2021). Analisis Beban Kerja pada Departemen Quality Control. Jurnal INTECH Teknik Industri Universitas Serang Raya, 7(1), 1–6. https://doi.org/10.30656/intech.v7i1.2537
Kanya, N. (2023). Workload Analysis Using Full Time Equivalent Method To Optimize Employee Performance At Pt. Xyz. Journal of Economics and Business, 3(3), 145–154.
Kurniawan, A., & Yasin, M. (2024). Strategi Orientasi Pada Industri Manufaktur. Jurnal Ekonomi Bisnis Dan Kewirausahaan, 1(4), 30–33.
Mahawati, E., Yuniwati, I., Ferinia, R., Rahayu, P. P., Fani, T., Sari, A. P., Setijaningsih, R. A., Fitriyatinur, Q., Sesilia, A. P., Mayasari, I., Dewi, I. K., & Bahri, S. (2021). Analisis Beban Kerja Dan Produktivitas Kerja. In Yayasan Kita Menulis. https://repository.unai.edu/id/eprint/285/1/2021-2022 Ganjil Analisis Beban Kerja Full_compressed.pdf
Pradana, A. Y., & Pulansari, F. (2021). Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi Di Pt. Xyz. Juminten, 2(1), 13–24. https://doi.org/10.33005/juminten.v2i1.217
Prangawayu, N., Anto, F. J. L., & Simangunsong, J. Y. (2021). Analisis Kebutuhan Tenaga Kerja Optimal dengan Metode Work Load Analysis (WLA) pada Extruder Technician I di Departemen Produksi. Seminar Nasional Teknik Dan Manajemen Industri, 1(1), 120–127. https://doi.org/10.28932/sentekmi2021.v1i1.29
Putra, B. I., & Jakaria, R. (2020). BUKU AJAR ANALISA ANALISA DAN PERANCANGAN SISTEM KERJA. Universitas Muhammadiyah Sidoarjo.
Tarwaka, Bakri, S. H. A., & Sudiajeng, L. (2004). Ergonomi untuk Keselamatan, Kesehatan Kerja dan Produktivitas. UNIBA Press. http://shadibakri.uniba.ac.id/wp-content/uploads/2016/03/Buku-Ergonomi.pdf
Utami, H. N., Prasetya, A., & Hendrawan, M. R. (2020). Analisis Beban Kerja Sebagai Dasar Perencanaan Kebutuhan Pegawai. Jurnal Bisnis Dan Manajemen, 7(2), 95–105. https://doi.org/10.26905/jbm.v7i2.4325
Zadry, H. R., Susanti, L., Yuliandra, B., & Jumeno, D. (2015). ANALISIS DAN PERANCANGAN SISTEM KERJA. Andalas University Press.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Fairuzzayyan Primadhiya, Rr Rochmoeljati

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.