Pengukuran waktu baku dan analisis beban kerja pada Produk Insulation Pillows di PT XYZ

Authors

  • Muhammad Ilham Perdiansyah Universitas Pembangunan Nasional "Veteran" Jawa Timur
  • Dira Ernawati Program Studi Teknik Industri, Fakultas Teknik dan Sains Universitas Pembangunan Nasional Veteran Jawa Timur

DOI:

https://doi.org/10.31004/jutin.v8i1.38901

Keywords:

Standard Time, Stopwatch Time Study, Workload

Abstract

PT XYZ, is a construction and steel fabrication company that has contributed to various national and international projects. One of its products is insulation pillows, used in a wide range of industrial applications. The study aims to measure standard time and analyze workload in the production process of insulation pillows at PT XYZ. Standard time measurement was conducted using the Stopwatch Time Study method for five main production stages: Marking Cutting, bending, fit-up, assembling, and packing. The results indicate that the standard times for each process are as follows: Marking Cutting (35.46 minutes/unit), bending (19.26 minutes/unit), fit-up (110.50 minutes/unit), assembling (168.26 minutes/unit), and packing (117.83 minutes/unit). Workload analysis revealed that the assembling process has an excessive workload of 175%, necessitating the addition of one worker to achieve optimal workload distribution. These findings provide recommendations for workforce optimization in the production process to enhance efficiency and meet production targets

References

Afiani, R., Pujotomo, D., & Mt, S. T. (2017). PENENTUAN WAKTU BAKU DENGAN METODE STOPWATCH TIME STUDY STUDI KASUS CV.MANS GROUP.

Arviyanda, R., Fernandito, E., & Landung, P. (2023). Analisis Perbedaan Bahasa dalam Komunikasi Antarmahasiswa. JURNAL HARMONI NUSA BANGSA, 1(1), 67. https://doi.org/10.47256/jhnb.v1i1.338

Djubaedah, S. N. (2019). STRATEGI PENGEMBANGAN DESA WISATA SEBAGAI MODEL PEMBERDAYAAN MASYARAKAT DI DESA BUDAYA PAMPANG SAMARINDA UTARA. 7(4), 511–524.

Febriani, S. (2022). Analisis Deskriptif Standar Deviasi.

Mariawati, A. S. (2019). PENGUKURAN WAKTU BAKU PELAYANAN OBAT BEBAS PADA PEKERJAAN KEFARMASIAN DI APOTEK CT. Journal Industrial Servicess, 5(1). https://doi.org/10.36055/jiss.v5i1.6491

Meila Sari, E., & Darmawan, M. M. (2020). PENGUKURAN WAKTU BAKU DAN ANALISIS BEBAN KERJA PADA PROSES FILLING DAN PACKING PRODUK LULUR MANDI DI PT. GLORIA ORIGITA COSMETICS. Jurnal ASIIMETRIK: Jurnal Ilmiah Rekayasa & Inovasi, 2(1), 51–61. https://doi.org/10.35814/asiimetrik.v2i1.1253

Nurhandayani, A. (2022). Pengaruh Lingkungan Kerja, Kepuasan Kerja, dan Beban Kerja terhadap Kinerja. JURNAL EKONOMI DAN BISNIS DIGITAL (EKOBIL), 1(2), 108–110. https://doi.org/10.58765/ekobil.v1i2.65

Pradana, A. Y., & Pulansari, F. (2021). ANALISIS PENGUKURAN WAKTU KERJA DENGAN STOPWATCH TIME STUDY UNTUK MENINGKATKAN TARGET PRODUKSI DI PT. XYZ. JUMINTEN, 2(1), 13–24. https://doi.org/10.33005/juminten.v2i1.217

Rahayu, M., & Juhara, S. (2020). Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. UNISTEK, 7(2), 93–97. https://doi.org/10.33592/unistek.v7i2.650

Rahma, C., Ariska, A., & Afriasari, V. (2018). OPTIMALISASI PELAYANAN UNIT BPJS RSUD MELALUI PERHITUNGAN WAKTU SIKLUS OPERATOR PELAYANAN SEP. 4.

Riftha Dhuha, A., Pradana, F., & Priyambadha, B. (2017). Pengembangan Sistem Aplikasi Manajemen Proyek Berbasis Web (Studi Kasus: PT. Swadaya Graha) (Vol. 1, Issue 11). http://j-ptiik.ub.ac.id

Sandi, C. K., Cahyono, N., Husodo, I. T., & Permata Suwandi, P. A. (2020). ANALISIS PRODUKTIVITAS PEKERJA DENGAN METODE TIME STUDY PADA PEKERJAAN KOLOM (STUDI KASUS PROYEK REHABILITASI PASAR JOHAR KOTA SEMARANG). Jurnal Teknik Sipil Giratory UPGRIS, 1(1), 1–10. https://doi.org/10.26877/giratory.v1i1.5421

Sri, M. (2012). ANALISIS PERENCANAAN TENAGA KERJA TERHADAP KEBUTUHAN TENAGA KERJA DI PROVINSI RIAU TAHUN 2006 - 2010. Pekbis Jurnal, 4(1), 54–62.

Sumarniati, N. K., Trifandi Lasalewo, & Irwan Wunarlan. (2023). PENGUKURAN BEBAN KERJA PADA WAKTU NORMAL DI DIVISI OPERASIONAL PT. PELINDO REGION IV GORONTALO DENGAN METODE FULL TIME EQUIVALENT (FTE). Jurnal Vokasi Sains Dan Teknologi, 2(2), 45–55. https://doi.org/10.56190/jvst.v2i2.33

Downloads

Published

2025-01-13

How to Cite

Perdiansyah, M. I., & Ernawati, D. (2025). Pengukuran waktu baku dan analisis beban kerja pada Produk Insulation Pillows di PT XYZ. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(1), 81–91. https://doi.org/10.31004/jutin.v8i1.38901

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.