Analisis Beban Kerja untuk Optimalisasi Produktivitas Tenaga Kerja pada Lini Produksi Mesin Pond (Studi kasus: UD. XYZ)
DOI:
https://doi.org/10.31004/jutin.v9i1.52364Keywords:
Workload, Workload analysis, Labor productivity, Standard Time, OptimizationAbstract
This study analyzes workload and determines the optimal number of workers on the pond machine production line at UD. XYZ using Workload Analysis (WLA) method and stopwatch time study. Data were collected through direct observation of 7 workers with 24 observations per work station during July-November 2025. The results show significant workload imbalance: the blade board manufacturing station experienced 446% overload, pond processes for Ivory 310, Duplex 350, and Duplex 310 were 185%, 191%, and 192% respectively, while plano paper cutting, QC cleaning, and packaging stations experienced underload below 75%. Standard time for pond processes ranged from 7.79-8.01 minutes. The study recommends adding 3 workers (total 10 people) with optimal redistribution to reduce workload to 46-111%, saving operational costs of Rp 10,368,000 per month (27%) while increasing productivity to achieve the target of 2,000 units per day.References
Febianti, A., Shulthoni, M., Masrur, M., & Aris Safi, M. (2023). Pengaruh Tingkat Pendidikan, dan Pengalaman Kerja Terhadap Produktivitas Kerja di Indonesia. Jurnal Ilmiah Multidisiplin Indonesia, 2(1), 198–204.
Ningsih, S. R. (2024). Pengaruh Teknologi Terhadap Produktivitas Tenaga Kerja di Indonesia. Benefit: Journal of Bussiness, Economics, and Finance, 2(1), 1–9. https://doi.org/10.70437/benefit.v2i1.341
Pradana, A. Y., & Pulansari, F. (2021). ANALISIS PENGUKURAN WAKTU KERJA DENGAN STOPWATCH TIME STUDY UNTUK MENINGKATKAN TARGET PRODUKSI DI PT . XYZ. 02(01), 13–24.
Putri, A. S. (2022). Pengukuran Beban Kerja Dan Optimalisasi Jumlah Karyawan Dengan Menggunakan Metode Work load Analysis (WLA) dan Work Force Analysis (WFA)Pada Stasiun Sterilizer Shift Pagi Di PTPN IV Unit Kebun Mayang.
Ropikoh, S., Idris, M., Nuh, G. M., & Zainal, M. (2024). PRODUK PANGAN ( The Development Of Food Product Packaging And Storage Technology ). 6(April), 30–38.
Setiawan, A., Sumartono, B., & Moektiwibowo, D. A. N. H. (2013). Analisis Beban Kerja Dengan Metode Work Load Analysis Untuk Meningkatkan Kinerja Teknisi Penguji Lampu Swabalast Di Pt. Sucofindo (Persero) Cibitung. Jurnal TeknikIndustri, 10(2), 115–121. https://doi.org/10.35968/jtin/v11i1/794
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Satria Abdi Wibisono, Jaka Purnama

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

