Analisis Pengendalian Waktu dan Biaya pada Proyek Pembangunan Gedung Medik RSU Assakinah Medika Menggunakan Earned Value Analysis

Authors

  • Eric Nora Setya Wijaya Universitas 17 Agustus 1945 Surabaya
  • Masca Indra Triana Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.31004/jutin.v8i4.50810

Keywords:

Cost, Earned Value, Time

Abstract

Earned Value (EV) is a control method to measure the performance of a project from a time aspect in a sustainable manner and make cost estimates required until the project is completed and the project completion time. This method is one of the appropriate methods to be used in analyzing the Assakinah Medika Hospital Medical Building Construction project where the realization of the progress of the ongoing work on the project does not meet the plan, which only reaches 33.077% where the progress of the ongoing work should have reached 41.795% so that the project experiences a deviation of -8.718%.

References

Bela, K. R. (2024). Analisa Pengendalian Waktu dan Biaya Pada Proyek Pembangunan Jalan Menggunakan Earned Value Method. Skripsi. Universitas 17 Agustus 1945 Surabaya.

Kristiana, R (2022). Penerapan Analisis Earned Value Sebagai EvaluasiKinerja Dari Segi Biaya dan Waktu Menggunakan Studi Kasus Proyek Apartemen Atlanta Di Depok Jawa Barat.

Muhtasar, P. S. (2021). Analisis Nilai Hasil (Earned Value Analysis) Terhadap Pengendalian Biaya Dan Waktu Pada Proyek Pembangunan Jembatan Alam Roh 17 Kabupaten Banjar (Doctoral dissertation, Universitas Islam Kalimantan MAB).

Pebriani, F. (2025). Analisa Kinerja Terhadap Waktu dan Biaya dengan Metode Earned Value Analysis pada Pembangunan Gedung Auditorium IAIN Samarinda. Kurva Mahasiswa, 1(1), 1813-1826.

Pertiwi, A. E. (2020). Evaluasi Pengendalian Waktu Pada Proyek Pembangunan Gedung Rawat Inap 3 Dan 4 RSUD Surdadi Menggunakan Earned Value Concept. Skripsi. Universitas Islam Indonesia. Yogyakarta.

Ramdhani, F. (2016). Analisis Biaya Dan Waktu Dengan Metode Earned Value Concept Pada Proyek BDJM Area RL Construction At Well 3S-21B Area 9 PT. Adhi Karya CS Work Unit Rate Packagea-Duri . ISSN 2527-7073, 17-35.

Wajhi, S. (2024). Pengendalian Waktu dan Biaya Pada Proyek Pemeliharaan Berkala Struktur

Ruas Jalan Menggunakan Earned Value Analysis. Skripsi. Universitas 17 Agustus 1945 Surabaya.

Downloads

Published

2025-10-02

How to Cite

Wijaya, E. N. S., & Triana, M. I. (2025). Analisis Pengendalian Waktu dan Biaya pada Proyek Pembangunan Gedung Medik RSU Assakinah Medika Menggunakan Earned Value Analysis. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(4), 3875–3882. https://doi.org/10.31004/jutin.v8i4.50810

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 9 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)