Analisis Produktivitas Tenaga Kerja dengan Metode Time and Motion Study pada Proses Packing CKD dengan Variasi Cycle Time

Authors

  • Dian Hadianto Universitas Pelita Bangsa
  • Heru Darmawan Universitas Pelita Bangsa
  • Agus Suwarno Universitas Pelita Bangsa

DOI:

https://doi.org/10.31004/jutin.v8i3.48095

Keywords:

Labor Productivity, Time and Motion Study, CKD Packing, Work Efficiency

Abstract

Labor productivity is one of the crucial factors in maintaining the sustainability and efficiency of the production process in manufacturing companies. This study aims to analyze labor productivity using the Time and Motion Study method in the CKD packing process at the maxi line of PT. XYZ, which has cycle time variations between product models (BRW, BKT, BDL, and BWE). The results show significant variations in work effectiveness and efficiency between models, as well as several ineffective activities such as material waiting time and outercase delays. By applying the Time and Motion Study method, this research provides recommendations in the form of cycle time evaluation, workload redistribution, and improvements in work layout and tools to enhance labor productivity.

References

Fardiansyah, I., Widodo, T., & Anggraini, W. (2022). Pengukuran Waktu Kerja Dengan Metode Time Motion Study Untuk Meningkatkan Produktivitas Kerja Produksi Greenware (Studi kasus : PT XYZ). Journal Industrial Manufacturing, 7(2), 85. https://doi.org/10.31000/jim.v7i2.6924

Ishak, A., & Cendani, A. S. (2021). Analisis Produktivitas Parsial di PT. Asam Jawa. Journal Energy and Engineering, 4(1), 140–147. https://doi.org/10.32734/ee.v4i1.1244

Latief, A., Famalya Melu, P., Halid Lahay, I., & Hasanuddin. (2021). Pengukuran Waktu Kerja Karyawan pada Pengemasan Es Kristal Menggunakan Metode Time Study. JAMBURA INDUSTRIAL REVIEW Annisa Latief Dkk, 1(2), 48–57. https://doi.org/10.37905/jirev.1.2.48-57

Pradana, M. F., Safar, L. O. A., & Pawitra, T. A. (2023). (Journal of Industrial and Manufacture Engineering). JIME (Journal of Industrial and Manufacture Engineering), 5(1), 30–40.

Purbasari, A., Sumarya, E., & Mardhiyah, R. (2023). Penerapan Metode Studi Waktu Dan Gerak Pada Proses Packing Di Pt. Abc. Sigma Teknika, 6(2), 290–299. https://doi.org/10.33373/sigmateknika.v6i2.5633

Septiyana, D. (2019). Evaluasi Pengukuran Waktu Kerja Dengan Metode Time Motion Study Pada Divisi Final Inspection Pt Gajah Tunggal Tbk. Jurnal Teknik, 8(1). https://doi.org/10.31000/jt.v8i1.1592

Simanjuntak, K. (n.d.). Analisis Produktifitas Pekerja Dengan Metode Produktifitas Parsial (Studi Kasus : PT. XYZ ). Jurnal Ilmiah Wahana Pendidikan, 2022(12), 151–155. https://doi.org/10.5281/zenodo.6943796

Sumerli, C. H., & Mayselah, N. (2023). Optimalisasi Produktivitas dengan Metode Time and Motion Study di PT. XYZ. Journal of Research on Industrial and System Engineering, 1(1), 1–12.

Downloads

Published

2025-07-15

How to Cite

Hadianto, D., Darmawan, H., & Suwarno, A. (2025). Analisis Produktivitas Tenaga Kerja dengan Metode Time and Motion Study pada Proses Packing CKD dengan Variasi Cycle Time. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(3), 3304–3310. https://doi.org/10.31004/jutin.v8i3.48095

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.