Pengoptimalan Produksi pada Pembuatan Rak Piring Berdasarkan Studi Waktu Kerja
DOI:
https://doi.org/10.31004/jutin.v8i3.46427Keywords:
Standard Time, Stopwatch Time Study, Manpower Requirement, Work MeasurementAbstract
UD Yurike, a furniture company in Surabaya, the production process in this company is constrained by the absence of a standard time to complete one unit of plate rack. This led to the absence of a target number of units to be completed by each worker per day. This condition has an impact on the difficulty of achieving targets in the midst of fluctuating demand and the manual assembly process. The purpose of this research is to understand the standard time to complete one unit of plate rack and the labor requirements per division using the Stopwatch Time Study method. The results of data processing show that the amount of standard time needed to complete one unit of plate rack is 1967.11 seconds (equivalent to 32.79 minutes), with additional labor requirements for the pipe frame coloring division to 2 workers and wire frame coloring to 4 workers and other.References
Amri, I. (2014). Pengantar Teknik Industri. Pengantar Teknik Industri, 3. https://www.infoteknikindustri.com/p/ebook-lengkap-teknik-industri.html
Andris, D. A. M., & Satoto, H. F. (2023). Tenaga Kerja Pada Produksi Cage Wheel Dengan Metode Stopwatch Time Study (Studi Kasus: CV . Lancar Jaya). Jurnal Taguchi, 3(1), 371–380. https://taguchi.lppmbinabangsa.id/index.php/home/article/view/93
Fardiansyah, I., Widodo, T., & Anggraini, W. (2022). Pengukuran Waktu Kerja Dengan Metode Time Motion Study Untuk Meningkatkan Produktivitas Kerja Produksi Greenware (Studi kasus : PT XYZ). Journal Industrial Manufacturing, 7(2), 85. https://doi.org/10.31000/jim.v7i2.6924
Isma, B., Bamban, R., Reviewer, S., & Wahab, Z. (2015). ANALISA DAN PERANCANGAN SISTEM KERJA.
Mahawati, E., Yuniwati, I., Ferinia, R., Rahayu, P. P., Fani, T., Sari, A. P., Setijaningsih, R. A., Fitriyatinur, Q., Sesilia, A. P., Mayasari, I., Dewi, I. K., & Bahri, S. (2021). Analisis Beban Kerja Dan Produktivitas Kerja. In Yayasan Kita Menulis. https://repository.unai.edu/id/eprint/285/1/2021-2022 Ganjil Analisis Beban Kerja Full_compressed.pdf
Meri, M., Fandeli, H., & Ramadhani, R. Z. (2022). Analisis Waktu Baku Proses Produksi Roti Dengan Metode Stopwatch Di Ukm Fandra Bakery. Journal of Science and Social Research, 5(2), 387. https://doi.org/10.54314/jssr.v5i2.887
Nurjaman, I. (2022). Analisis Pengukuran Kerja Produksi Dengan Menggunakan Metode Time Study Di Ukm Sandal Camel Mangkubumi Tasikmalaya. Jurnal Media Teknologi, 7(1), 49–62. https://doi.org/10.25157/jmt.v7i1.2633
Pradana, A. Y., & Pulansari, F. (2021). Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi Di Pt. Xyz. Juminten, 2(1), 13–24. https://doi.org/10.33005/juminten.v2i1.217
Subhan Afifi, M., & Yuwono, I. (2023). Pengoptimalan Tenaga Kerja Dan Penentuan Waktu Standar Pada Produksi Songkok (Studi Kasus di Home Industry Achmad Rochman Lamongan). Industrika : Jurnal Ilmiah Teknik Industri, 7(2), 199–207. https://doi.org/10.37090/indstrk.v7i2.984
Zadry, Raimona, H., Lusi, SusaZadry, Raimona, H., Lusi, S., Yuliandra, B., & Desto, J. (2015). Analisis Dan Perancangan Sistem Kerja. Journal of Chemical Information and Modeling, 53(9), 1689–1699.nti, Yuliandra, B., & Desto, J. (2015). Analisis Dan Perancangan Sistem Kerja. In Journal of Chemical Information and Modeling (Vol. 53, Issue 9).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Izudien Fahmi, Erni Puspanantasari Putri

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

