Pengoptimalan Produksi pada Pembuatan Rak Piring Berdasarkan Studi Waktu Kerja

Authors

  • Izudien Fahmi Universitas 17 Agustus 1945 Surabaya
  • Erni Puspanantasari Putri Univeritas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.31004/jutin.v8i3.46427

Keywords:

Standard Time, Stopwatch Time Study, Manpower Requirement, Work Measurement

Abstract

UD Yurike, a furniture company in Surabaya, the production process in this company is constrained by the absence of a standard time to complete one unit of plate rack. This led to the absence of a target number of units to be completed by each worker per day. This condition has an impact on the difficulty of achieving targets in the midst of fluctuating demand and the manual assembly process. The purpose of this research is to understand the standard time to complete one unit of plate rack and the labor requirements per division using the Stopwatch Time Study method. The results of data processing show that the amount of standard time needed to complete one unit of plate rack is 1967.11 seconds (equivalent to 32.79 minutes), with additional labor requirements for the pipe frame coloring division to 2 workers and wire frame coloring to 4 workers and other.

References

Amri, I. (2014). Pengantar Teknik Industri. Pengantar Teknik Industri, 3. https://www.infoteknikindustri.com/p/ebook-lengkap-teknik-industri.html

Andris, D. A. M., & Satoto, H. F. (2023). Tenaga Kerja Pada Produksi Cage Wheel Dengan Metode Stopwatch Time Study (Studi Kasus: CV . Lancar Jaya). Jurnal Taguchi, 3(1), 371–380. https://taguchi.lppmbinabangsa.id/index.php/home/article/view/93

Fardiansyah, I., Widodo, T., & Anggraini, W. (2022). Pengukuran Waktu Kerja Dengan Metode Time Motion Study Untuk Meningkatkan Produktivitas Kerja Produksi Greenware (Studi kasus : PT XYZ). Journal Industrial Manufacturing, 7(2), 85. https://doi.org/10.31000/jim.v7i2.6924

Isma, B., Bamban, R., Reviewer, S., & Wahab, Z. (2015). ANALISA DAN PERANCANGAN SISTEM KERJA.

Mahawati, E., Yuniwati, I., Ferinia, R., Rahayu, P. P., Fani, T., Sari, A. P., Setijaningsih, R. A., Fitriyatinur, Q., Sesilia, A. P., Mayasari, I., Dewi, I. K., & Bahri, S. (2021). Analisis Beban Kerja Dan Produktivitas Kerja. In Yayasan Kita Menulis. https://repository.unai.edu/id/eprint/285/1/2021-2022 Ganjil Analisis Beban Kerja Full_compressed.pdf

Meri, M., Fandeli, H., & Ramadhani, R. Z. (2022). Analisis Waktu Baku Proses Produksi Roti Dengan Metode Stopwatch Di Ukm Fandra Bakery. Journal of Science and Social Research, 5(2), 387. https://doi.org/10.54314/jssr.v5i2.887

Nurjaman, I. (2022). Analisis Pengukuran Kerja Produksi Dengan Menggunakan Metode Time Study Di Ukm Sandal Camel Mangkubumi Tasikmalaya. Jurnal Media Teknologi, 7(1), 49–62. https://doi.org/10.25157/jmt.v7i1.2633

Pradana, A. Y., & Pulansari, F. (2021). Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi Di Pt. Xyz. Juminten, 2(1), 13–24. https://doi.org/10.33005/juminten.v2i1.217

Subhan Afifi, M., & Yuwono, I. (2023). Pengoptimalan Tenaga Kerja Dan Penentuan Waktu Standar Pada Produksi Songkok (Studi Kasus di Home Industry Achmad Rochman Lamongan). Industrika : Jurnal Ilmiah Teknik Industri, 7(2), 199–207. https://doi.org/10.37090/indstrk.v7i2.984

Zadry, Raimona, H., Lusi, SusaZadry, Raimona, H., Lusi, S., Yuliandra, B., & Desto, J. (2015). Analisis Dan Perancangan Sistem Kerja. Journal of Chemical Information and Modeling, 53(9), 1689–1699.nti, Yuliandra, B., & Desto, J. (2015). Analisis Dan Perancangan Sistem Kerja. In Journal of Chemical Information and Modeling (Vol. 53, Issue 9).

Downloads

Published

2025-07-04

How to Cite

Fahmi, I., & Putri, E. P. (2025). Pengoptimalan Produksi pada Pembuatan Rak Piring Berdasarkan Studi Waktu Kerja. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(3), 2576–2585. https://doi.org/10.31004/jutin.v8i3.46427

Issue

Section

Articles of Research

Similar Articles

<< < 17 18 19 20 21 22 23 24 25 26 > >> 

You may also start an advanced similarity search for this article.