Perancangan Ulang Tata Letak Fasilitas Pabrik Menggunakan Metode 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) di PT. Basukigraha Fabrikatama

Authors

  • Ari Kuntoro Aji Program Studi Teknik Industri, Fakultas Teknik, Universitas Pelita Bangsa
  • Dwi Irwati Universitas Pelita Bangsa
  • Muhammad Najamuddin Universitas Pelita Bangsa

DOI:

https://doi.org/10.31004/jutin.v8i2.45061

Keywords:

Factory Relayout, 5S, Conventional Method, Facility Design

Abstract

The design of production facilities greatly affects the company's performance because a poor layout can lead to inefficient material flow, increased production costs, and delays in product completion. A good layout in the manufacturing industry is important to maximize area usage and create a smooth flow of materials. Factory layout problems, such as long material movement distances between departments, can affect productivity and profitability. This study aims to minimize material handling costs by determining the best layout. The steps taken include calculating material transfer distances and handling costs in the initial layout, as well as proposing a new layout using the 5S method. After data processing, the initial layout distance previously had a distance of 31.49 m on the proposed layout to 27.63 m and the OHM of the previous initial layout was Rp. 19,213,161.63 per month on the proposed layout to Rp. 16,984,714.11 per month. The results show improvement, with a reduction in material transfer distance and lower monthly handling costs in the proposed layout.

References

D. Khairani Sofyan and Syarifuddin, “Perancangan Ulang Tata Letak Fasilitas dengan Menggunakan Metode Konvensional Berbasis 5S (Seiri, Seiton, Seiso, Seiketsu dan Shitsuke),” J. Teknovasi, vol. 02, no. 2, pp. 27–41, 2015.

Devani, V. (2016). Analisis Penerapan Konsep 5S di Bagian Proses Maintenance PT Traktor Nusantara. Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri, 2(2), 113-120.

I. Adiasa, R. Suarantalla, M. S. Rafi, and K. Hermanto, “Perancangan Ulang Tata Letak Fasilitas Pabrik Di CV. Apindo Brother Sukses Menggunakan Metode Systematic Layout Planning (SLP),” Performa Media Ilm. Tek. Ind., vol. 19, no. 2, pp. 151–158, 2020, doi: 10.20961/performa.19.2.43467.

Kelvin, Pram Eliyah Yuliana, & Sri Rahayu. (2020). Penentuan Tata Letak Gudang Sparepart Non-Genuine Pada Bengkel Mobil di Surabaya dengan Metode Dedicated Storage. Journal of Information System, Graphics, Hospitality and Technology, 2(02), 47–53. https://doi.org/10.37823/insight.v2i02.104.

Okka Adiyanto dan Anom Firda Clistia. (2020). “Perancangan Ulang Tata Letak Fasilitas Produksi UKM Eko Bubut dengan Metode Computerized Relationship Layout Planning.” Jurnal Integrasi Sistem Industri 7 (1): 50.

Osada, T. (2004)., Sikap Kerja 5S: Seiri Pemilahan, Seiton Penataan, Seiso Pembersihan, Seiketsu Pemantapan, Shitsuke Pembiasaan. Penerjemah: Dra. Mariani Gandamihardja. Jakarta. Penerbit PPM.

Pramudian K Nadiya, dan Susanto Novie. (2019) Analisis Penerapan Metode 5S pada Warehouse Fast Moving PT Indonesia Power UBP Mrica Kabupaten Banjarnegara. Semarang. Media Ilmiah Teknik Industri.

R. K. Dewi, M. Choiri, and A. Eunike, “Perancangan Tata Letak Fasilitas Menggunakan Metode Blocplan dan Analytic Hierarchy Process (AHP) (Studi Kasus: Koperasi Unit Desa Batu),” J. Rekayasa dan Manaj. Sist. Ind., vol. 2, no. 3, pp. 624–636, 2017.

Rinawati, D. I., WP, S. N., & Lisano, N. (2016). Rancangan Penerapan 5S Guna Mereduksi Searching Time Pada Area 1 PT XYZ. Prosiding SNST Fakultas Teknik, 1(1).

Sahara, S. N., & Bakhtiar, A. (2016). Perbaikan Tata Letak Penempatan Material Di Area Gudang Penyimpanan Material Berdasarkan Clas Based Storage Policy (Studi Kasus: Gudang PT TIMATEX SALATIGA). Jurnal Teknik Industri Universitas Diponegoro. Vol.5, No 4

Downloads

Published

2025-04-10

How to Cite

Aji, A. K., Irwati, D., & Najamuddin, M. (2025). Perancangan Ulang Tata Letak Fasilitas Pabrik Menggunakan Metode 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) di PT. Basukigraha Fabrikatama. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(2), 2120–2126. https://doi.org/10.31004/jutin.v8i2.45061

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.