Analisis Kinerja Biaya dan Waktu dengan Metode Earned Value Analysis (Studi Kasus: Revitalisasi Pasar Gembrong Sukasari)
DOI:
https://doi.org/10.31004/jutin.v8i2.44077Keywords:
Construction Management, Cost Control, Earned Value Analysis, Project Performance, Schedule DelayAbstract
The construction industry in Indonesia continues to grow, yet projects often face deviations from initial plans, particularly concerning cost overruns and schedule delays. This study evaluates the cost and schedule performance of the Revitalization of Pasar Gembrong Sukasari Market using Earned Value Analysis (EVA), a quantitative method for monitoring project efficiency. Data were derived from weekly progress reports, S-curve projections, and the project’s budget plan (RAB). At week 35, the Planned Value (BCWS) was IDR 55,052,769,527.00, while the Earned Value (BCWP) and Actual Cost (ACWP) both amounted to IDR 49,830,463,809.67. The Cost Variance (CV) of IDR 0 and Cost Performance Index (CPI) of 1.00 indicated precise adherence to the budget. However, a Schedule Variance (SV) of -IDR 5,222,305,717.33 and a Schedule Performance Index (SPI) of 0.905 revealed significant schedule delays. These findings demonstrate that while the project maintained financial efficiency, critical time management inefficiencies led to schedule overruns. The study underscores the effectiveness of EVA in identifying performance gaps and highlights the need for improved scheduling strategies to align time and cost objectives in construction management.References
A. Suryanti, I.N.A.S. Putra, & F. Nurrahman. (2021). Pengembangan Media Pembelajaran Energi Alternatif Berbasis Multimedia Interaktif. Jurnal Teknologi Pembelajaran Indonesia, 11(2), 147–156. https://doi.org/10.23887/jurnal_tp.v11i2.651
Adriansyah, B. P., & Prafitasiwi, A. G. (2024). Analisa Biaya Dan Waktu Menggunakan Metode Earned Value Pada Proyek SMAK Untung Suropati Sidoarjo. Jurnal Teknik Sipil Dan Lingkungan, 1(1), 39. https://doi.org/10.30587/jtsl.v1i1.7438
Anggraini, N., & Tyas, A. M. (2023). Analisis Penerapan Metode Pengakuan Pendapatan Menurut Sak Etap Dan Psak 72 Pada Pt. Gunawangsa Putra Perkasa. Akmen Jurnal Ilmiah, 20(1), 26–38. https://e-jurnal.nobel.ac.id/index.php/akmen
Ariana, I. K. A., & Lestari, D. A. (2023). Analisis Kinerja Proyek Optimalisasi SPAM Gatak Kabupaten Sukoharjo dengan Metode Earned Value. Journal of Integrated System, 6(1), 87–102. https://doi.org/10.28932/jis.v6i1.6521
Duwi Meidha Sari, I., Saifuddin Zuhri, M., & Rini Rubowo, M. (2020). Profil Kemampuan Berpikir Kreatif Siswa dalam Memecahkan Masalah Matematika pada Materi SPLTV Ditinjau dari Gaya Kognitif Reflektif dan Impulsif. Imajiner: Jurnal Matematika Dan Pendidikan Matematika , 2(5), 391–400.
Irfan Syahroni, M. (2022). Prosedur Penelitian Kuantitatif. EJurnal Al Musthafa, 2(3), 43–56. https://doi.org/10.62552/ejam.v2i3.50
Nur Rachmania, & Retno Fuji Oktaviani. (2024). Pengaruh Current Ratio, Total Asset Turnover, Return on Equity dan Net Profit Margin terhadap Pertumbuhan Laba. Jurnal Riset Manajemen, 2(3), 320–333. https://doi.org/10.54066/jurma.v2i3.2275
Nurhanif, N., Away, Y., & Surbakti, M. S. (2021). Performance Analysis of Database Synchronization on DBMS MySQL and Oracle by Using Event-Driven and Time-Driven Data for Monitoring Weather. Journal of Aceh Physics Society, 10(4), 107–112. https://doi.org/10.24815/jacps.v10i4.20084
Putra, R. G., Fatmawati, W., & Mas’idah, E. (2020). Analisa Waktu Dan Biaya Proyek Konstruksi Pembangunan Gedung Gudang Dan Kantor PT ABC Semarang Dengan Earned Value Analysis. Konferensi Ilmiah Mahasiswa Unissula (KIMU) 3, 101–126.
Saputra, H. P., Hafiz, A. P., & Ismadharliani, A. (2024). Analisis Penerapan Reward dan Punishment Pada Kinerja Pegawai di Bank Syariah Indonesia KCP Muara Bulian. Journal of Shariah and Islamic Economics, 5(3), 431–441.
Soeltanong, M. B., & Sasongko, C. (2021). Perencanaan Produksi dan Pengendalian Persediaan pada Perusahaan Manufaktur. Jurnal Riset Akuntansi & Perpajakan (JRAP), 8(01), 14–27. https://doi.org/10.35838/jrap.2021.008.01.02
Sofia, D. A., Wildan, M., & Yusdinar, H. (2022). Analisis Kinerja Proyek Pembangunan Gedung Menggunakan Konsep Earned Value. Akselerasi : Jurnal Ilmiah Teknik Sipil, 4(1), 19–25. https://doi.org/10.37058/aks.v4i1.5373
Subekti, M. I., Yulianto, T., Sundari, T., & Nugroho, M. W. (2024). Analisis Komparatif Penerapan Metode Pengupahan Harian Dan Borongan Pada Proyek Renovasi Gedung Sekolah Dasar. Jurnal Media Konstruksi, 9(3), 269–274.
Suryanto, T. L. mardi, Daniati, E., Wibowo, N. C., Mijiarto, J., Nuryananda, P. F., & Nurharyana, A. S. (2024). Pemanfaatan Integrasi Smartwatch dan Aplikasi Forza dalam Meningkatkan Kinerja Tim Sepak Bola Mangun Jaya F.C. Jurnal Pengabdian Masyarakat, 4(3), 2365–2372.
Syahputra, H., Abdillah, W., Widodo, S., & Anwar, S. (2022). Manajemen Risiko Proyek Berdasarkan Panduan Body of Knowledge Manajemen Proyek 2017. Jurnal Manajemen Dan Bisnis, 2(1), 01–13. https://doi.org/10.32509/jmb.v2i1.1987
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Teguh Eko Saputro, Muhammad Oka Mahendra, Al Fiillian Sah Putra

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

