Analisis Kelayakan Pembangkit Listrik Tenaga Surya Rooftop 369,36 kWp Berbasis Leasing di Perusahaan Listrik XYZ

Authors

  • Ivan Abhirama Univeristas Pembangunan Negeri "Veteran" Jawa Timur
  • Raditya Jarwenda Novasani Universitas Pembangunan Veteran Jawa Timur

DOI:

https://doi.org/10.31004/jutin.v9i1.54042

Keywords:

rooftop photovoltaic, self-consumption, energy efficiency, renewable energy

Abstract

The increasing demand for electrical energy has encouraged XYZ Electricity Company to optimize the use of renewable energy, one of which is through rooftop Solar Power Plants (PLTS). This study aims to analyze the contribution of rooftop PLTS with a capacity of 369.36 kWp to increasing PS efficiency. This study is a quantitative study that uses operational data from the generating unit's own consumption and PLTS energy production data as samples, which are analyzed through a comparison of conditions before and after the implementation of PLTS. The results show that rooftop PLTS is able to reduce energy needs from the main generating system, increase PS efficiency especially during the day, and provide economic benefits through reduced electricity costs. Therefore, optimization of rooftop PLTS is recommended as a strategy to increase energy efficiency and the operational sustainability of power plants.

References

Aini, N., & Yuliastuti, R. (2021). SISTEM AKUNTANSI PENGELUARAN KAS PADA PT LINTAS SAMUDRA. EKONOMIA, 7(1), 40–52.

Aminullah, F., Sari, A. W., & Martin, A. (n.d.). ANALISIS UNJUK KERJA HEAT RECOVERY STEAM GENERATOR ( HRSG ) PADA PLTGU PT . XYZ. JURNAL PROKSIMA, 2(2), 48–52.

Cinicy, O. S. R., Windarta, J., & Saptadi, S. (2023). Studi Kelayakan Ekonomi Pembangkit Listrik Tenaga Surya Rooftop 32 kWp di Gedung Kantor PT . KPJB , PLTU Tanjung Jati B, Kabupaten Jepara. Jurnal Energi Baru & Terbarukan, 4(2), 97–107. https://doi.org/10.14710/jebt.2023.17574

Khayubi, A., Asmadi, M., Adhi, B. K., & Hasani, M. R. (2024). MEMBANGUN KEBERLANJUTAN LINGKUNGAN MELALUI INOVASI SOSIAL MEKARSARI PROGRAM CSR PT INDONESIA POWER PERUSAHAAN LISTRIK XYZ DI DESA RANUKLINDUNGAN, PASURUAN Building. Jurnal Abdi Insani, 11(3), 910–921.

Maharani, B. C., & Nurjanah, Y. (2023). Tinjauan Atas Prosedur Kas Masuk Dan Kas Keluar Pada Agria Hotel Bogor. Jurnal Ilmiah Pariwisata Kesatuan, 4(2), 81–90. https://doi.org/10.374/jipkes.v3i2.2070

Mahfud, A. U., Saefudin, S., Nugroho, H. A., Pujianto, M. E., Subri, M., Muntasiroh, L., & Afif, I. Y. (2025). Implementasi Pembangkit Listrik Tenaga Surya ( PLTS ) Menggunakan Sistem Off-Grid untuk Meningkatkan Kemandirian Energi Masyarakat. JURNAL PENGABDIAN MASYARAKAT TEKNIK, 7(2), 137–142. https://doi.org/10.24853/jpmt.7.2.137-142

Pijoh, F., K, B. D. P., & Purba, L. P. (2024). Pembangkit Listrik Tenaga Surya untuk Energi Ramah Lingkungan yang Berkelanjutan. Ndustrial & System Engineering Journals, 2(2), 201–207.

Purba, C. A. D., Wicaksono, O. W., Wijaya, I. W. A., & Budiastra, I. N. (2023). PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA ATAP DI HOTEL MEGA DANA. Jurnal SPEKTRUM, 10(3), 57–67.

Putra, M. A., & Prabowo, E. (2025). Analisis kelayakan proyek pembangunan pusat listrik tenaga surya (PLTS) apung Tembesi 40 MWp di sistem kelistrikan Batam–Bintan. Jurnal Amplifier, 15(1), 9–18. https://doi.org/10.33369/jamplifier.v15i1.35885

Shopia, S., & Marliana, W. (2024). Analisis Kelayakan Investasi Penambahan Alat Berat dengan Pendekatan Aspek Finansial. Journal of Business and Economics Research (JBE), 5(3), 370–378. https://doi.org/10.47065/jbe.v5i3.5849

Downloads

Published

2026-01-03

How to Cite

Abhirama, I., & Novasani, R. J. (2026). Analisis Kelayakan Pembangkit Listrik Tenaga Surya Rooftop 369,36 kWp Berbasis Leasing di Perusahaan Listrik XYZ. Jurnal Teknik Industri Terintegrasi (JUTIN), 9(1), 626–635. https://doi.org/10.31004/jutin.v9i1.54042

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.