Evaluasi Waste Waktu Tunggu dan Produk Cacat Pembuatan Produk Furniture dalam Upaya Peningkatan Produksi Pada UD. Sinar Indah

Authors

  • Aditya Nur Firmansyah Universitas 17 Agustus 1945 Surabaya
  • Siti Mundari Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.31004/jutin.v9i1.52426

Keywords:

Productivity, Lean Manufacturing, Waste, Furniture

Abstract

Productivity is one of the key factors in enhancing industrial competitiveness, particularly in the furniture manufacturing sector. This study aims to analyze the types and sources of waste occurring in the production process at UD. Sinar Indah and to formulate improvement strategies to increase productivity. The research applies the lean manufacturing approach by identifying the seven types of waste commonly found in production activities. Data were collected through direct observation on the shop floor, interviews with employees, and process time recording. The findings indicate that the most dominant wastes are waiting time and inefficient movements, which significantly affect productivity levels. Recommended improvements include workplace layout rearrangement, standardization of procedures, and enhancement of operator skills. By implementing these improvements, UD. Sinar Indah has the potential to increase productivity while reducing production costs. 

References

Akhmad, J., & Masudin, I. (2018). Pengendalian pemborosan (waste) pada sistem produksi manufaktur. Jurnal Teknik Industri, 112–120.

Aprilianti, C. (2024). Analisis produktivitas tenaga kerja pada industri manufaktur. Jurnal Manajemen Produksi, 45–53.

Berg, M. (2017). Productivity measurement and industrial performance. Manufacturing Performance Review, 201–214.

Fazlollahtabar, H., & Hassanli, A. (2019). Lean assessment and prioritization for furniture manufacturing process. Journal of Manufacturing Technology Management, 30(3), 481–498.

Hines, P., & Rich, N. (1997). The seven value stream mapping tools. International Journal of Operations & Production Management, 17(1), 46–64.

Luiz, A. (2019). Total productivity improvement in manufacturing systems. International Journal of Productivity Studies, 55–63.

Mali, P. (2019). Measuring organizational productivity: Concepts and applications. Productivity Press.

Rahani, A. R., & Al-Ashraf, M. (2012). Production flow analysis through value stream mapping: A lean manufacturing process case study. Procedia Engineering, 41, 1727–1734.

Sari, R. S. (2022). Identifikasi pemborosan (waste) sebagai upaya peningkatan produktivitas pada industri manufaktur. Jurnal Rekayasa Sistem Industri, 289–297.

Summanth, D. J. (2018). Productivity engineering and management: Improving productivity in manufacturing and service organizations. McGraw-Hill.

Downloads

Published

2026-01-03

How to Cite

Firmansyah, A. N., & Mundari, S. (2026). Evaluasi Waste Waktu Tunggu dan Produk Cacat Pembuatan Produk Furniture dalam Upaya Peningkatan Produksi Pada UD. Sinar Indah. Jurnal Teknik Industri Terintegrasi (JUTIN), 9(1), 238–245. https://doi.org/10.31004/jutin.v9i1.52426

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>