Perencanaan Pengendalian Bahan Baku Pembuatan Standar Motor, Bastep Motor, dan Stang Motor (Studi Kasus: UD. X)

Authors

  • Putra Riski Rendragraha Universitas 17 Agustus 1945 Surabaya
  • Siti Mundari Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.31004/jutin.v8i3.46492

Keywords:

Inventory Planning, Raw Materials, Material Requirement Planning (MRP), Motorcycle Handlebar, Footrest, Center Stand

Abstract

This research aims to develop a systematic raw material planning and control strategy for the production of three motorcycle components—center stands, footrests (bastep), and handlebars—at UD KS Pro, in order to minimize inventory costs and prevent both shortages and excess of raw materials. The company currently faces inefficiencies in managing raw materials, particularly iron pipes and iron plates, due to the absence of a structured planning method. This study employs a Material Requirement Planning (MRP) approach using historical demand data, the Master Production Schedule (MPS), and the Bill of Materials (BOM). The analysis process includes demand forecasting using the Moving Average method, calculating net material requirements, determining safety stock, reorder points, and lot sizing. The results show that implementing MRP helps the company optimize order quantities, reduce stock imbalance risks, and improve both cost efficiency and production continuity. This research is expected to serve as a reference for UD KS Pro in making more accurate and structured inventory management decisions.

References

Fauzi & Hartono, 2019. 2019. “Analisis Persedian Bahan Baku, Reorder Point Dan Safety Stock Bahan Baku ADC-12.”

Prawirosentono, 2001. n.d. “ANALISIS PERBANDINGAN PENGENDALIAN PERSEDIAAN BAHAN BAKU DENGAN PENDEKATAN METODE ECONOMIC ORDER QUANTITY DAN METODE KANBAN.”

Ristono, 2013:1 dalam jurnal Rudi Handoyono, dkk, 2018) [2]. 2018. “No Title.” ANALISIS PENGENDALIAN PERSEDIAAN OLI MESIN DENGAN METODE ECONOMIC ORDER QUANTITY (EOQ) DAN RE-ORDER POINT (ROP) DI TOKO JAWAD PUTRA TEGAL.

Achmad Slamet. 2007. “PENGENDALIAN PERSEDIAAN BAHAN BAKU DENGAN METODE ECONOMIC ORDER QUANTITY (EOQ) PADA SALSA BAKERY JEPARA.”

Arman Hakim Nasution. 2008. PERENCANAAN & PENGENDALIAN PERSEDIAAN.

Assauri (2008:250). n.d. “ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU IKAN PADA PT. CELEBES MINAPRATAMA BITUNG.”

Freddy Rangkuty. 2004. “ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU GUNA MEMINIMALKAN BIAYA PERSEDIAAN PADA DUNKIN DONUTS MANADO.”

Hazimah, 2020. 2020. “Kombinasi Penentuan Safety Stock Dan Reorder Point Berdasarkan Analisis ABC Sebagai Alat Pengendalian Persediaan Cutting Tools.”

Mulyadi (2014). 2014. “PENGENDALIAN PERSEDIAAN BAHAN BAKU DALAM EFISIENSI BIAYA PRODUKSI.”

Rangkuti (2007:4). 2007. “PENGARUH BIAYA OPERASIONAL DAN PERPUTARAN PERSEDIAAN TERHADAP PROFITABILITAS.”

Rangkuti, 2007:26). 2007. “ANALISISPENGENDALIAN PERSEDIAAN BAHANBAKU PRODUKSIROTI WILTON KUALASIMPANG.”

Downloads

Published

2025-07-04

How to Cite

Rendragraha, P. R., & Mundari, S. (2025). Perencanaan Pengendalian Bahan Baku Pembuatan Standar Motor, Bastep Motor, dan Stang Motor (Studi Kasus: UD. X). Jurnal Teknik Industri Terintegrasi (JUTIN), 8(3), 2937–2943. https://doi.org/10.31004/jutin.v8i3.46492

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>