Analisis Produktivitas Kerja dan Penjadwalan Perawatan Mesin Lipat Divisi Kasa Premium dengan Metode Preventive Maintenance

Authors

  • Nadila Dwi Setiawati Universitas 17 Agustus 1945 Surabaya
  • Jaka Purnama Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.31004/jutin.v9i1.52424

Keywords:

Productivity, Maintenance, Mean Time To Failure

Abstract

PT. Kasa Husada Wira Jatim is a manufacturing company engaged in the manufacture of medical devices, the products produced are gauze, medical masks, and also cotton. In the production process the system used is Make To Order, this results in the absence of ready stock stored, many delays in completing orders. This study aims to determine the level of work productivity using the Overall Equipment Effectiveness (OEE) method, and also the maintenance schedule for folding machines. The folding machine of the Premium Kasa Division which is often damaged, in the period from August 2024 to July 2025 there were 31 damages with critical components of the knife and seal. From the results of the Mean Time To Failure calculation for the knife component, the replacement time is once every 26 days, for the seal component once every 19 days. This study is expected to minimize delays in completing orders.

References

Mahawati, E., Yuniwati, I., Ferinia, R., Rahayu, P. P., Fani, T., Sari, A. P., Setijaningsih, R. A., Qurnia, F., Mayasari, I., Sesilia, P. A., Dewi, I. K., & Bahri, S. (2021). Analisis Beban Kerja dan Produktivitas. https://repository.unai.edu/id/eprint/285/1/2021-2022 Ganjil Analisis Beban Kerja Full_compressed.pdf

Pendidikan, S., Mesin, T., Teknik, F., Negeri, U., Teknik, J., Fakultas, M., Universitas, T., & Surabaya, N. (2019). PENENTUAN PENJADWALAN PREVENTIVE MAINTENANCE PADA KOMPONEN MESIN CALLENDER DI PT . KARET NGAGEL SURABAYA WIRA JATIM Dyah Riandadari. 09, 8–16.

Suliantoro, H., Susanto, N., Prastawa, H., Sihombing, I., & Mustikasari, A. (2017). Penerapan Metode Overall Equipment Effectiveness (Oee) Dan Fault Tree Analysis (Fta) Untuk Mengukur Efektifitas Mesin Reng. J@ti Undip : Jurnal Teknik Industri, 12(2), 105. https://doi.org/10.14710/jati.12.2.105-118

Yang Aysia, D. A. (2025). Upaya Mengatasi Keterlambatan Proses Produksi Tangki Medikal (Studi Kasus). Prosiding Seminar Nasional KONSTELASI, 2(1), 180–191. https://doi.org/10.24002/prosidingkonstelasi.v2i1.10926

Cahyani, O. D., & Iftadi, I. (n.d.). Penjadwalan Preventive Maintenance dengan Metode Reliability Centered Maintenance pada Stasiun Cabinet PU di PT IJK Preventive Maintenance Scheduling with Reliability Centered Maintenance

Downloads

Published

2026-01-20

How to Cite

Setiawati, N. D., & Purnama, J. (2026). Analisis Produktivitas Kerja dan Penjadwalan Perawatan Mesin Lipat Divisi Kasa Premium dengan Metode Preventive Maintenance. Jurnal Teknik Industri Terintegrasi (JUTIN), 9(1), 941–950. https://doi.org/10.31004/jutin.v9i1.52424

Issue

Section

Articles of Research

Similar Articles

<< < 3 4 5 6 7 8 9 10 11 12 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>