Analisis Waktu Standar untuk Menentukan Jumlah Tenaga Kerja dalam Memenuhi Permintaan Produksi Kerupuk Puli di UD. XYZ

Authors

  • Fauzan Nasik Abdullah Wibawa Universitas 17 Agustus 1945 Surabaya
  • Handy Febri Satoto Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.31004/jutin.v9i1.52061

Keywords:

Standard Time, Stopwatch Time Study, Workload analysis, Manpower, Productivity

Abstract

UD. XYZ in Sidoarjo encountered difficulties in meeting market demand due to an uneven imbalance of workers production stations, leading to process delays and reduced efficiency. This research aims to establish the standard time and determine the optimal workforce allocation to enhance the cracker (kerupuk puli) production process. Stopwatch time study and workload analysis were used to assess data collected through direct observation, interviews, and documentation. The findings revealed a total standard time of 1464.55 seconds or approximately 24.41 minutes to produce one 5 kg package of crackers. Based on the analysis, workforce adjustments were required: mixing and grinding increased from 1 to 2 workers, boiling decreased from 3 to 2, cooling and cutting each remained at 1, while drying and packaging were reduced from 4 to 2 workers. These changes are expected to improve efficiency and ensure production targets are consistently met.

References

Andris, D. A. M., & Satoto, H. F. (2023). Tenaga Kerja Pada Produksi Cage Wheel Dengan Metode Stopwatch Time Study (Studi Kasus: CV . Lancar Jaya). Jurnal Taguchi, 3(1), 371–380. https://taguchi.lppmbinabangsa.id/index.php/home/article/view/93

Aysyiawan, P. V., & Satoto, H. F. (2022). Analisis Pengukuran Waktu Kerja Dan Beban Kerja Mental Guna Menentukan Tenaga Kerja Yang Optimal Pada Cv. Xyz. Prosiding Senakama, 1(September), 183–192.

Mahendra, S. M. A. (2025). Analisis Beban Kerja Berdasarkan Time Study Dan Work Load Analysis ( Wla ) ( Studi Kasus : Pabrik Kerupuk Subur ). Skripsi, Nama No. Mahasiswa : Sulthan Muhammad Armyn Mahendra : 20522184 PROGRAM STUDI TEKNIK INDUSTRI PROGRAM SARJANA FAKULTAS TEKNOLOGI INDUSTRI UNIVERSITAS ISLAM INDONESIA YOGYAKARTA.

Ramadhaniyah, N. A., & Satoto, H. F. (2025). Analisis Waktu Kerja untuk Penentuan Kebutuhan Tenaga Kerja dalam Memenuhi Permintaan di CV. Barokah Metal Sidoarjo. Jurnal Surya Teknika, 12(1), 182–186. https://doi.org/10.37859/jst.v12i1.9347

Suryaningrat, I. B., Kuswardhani, N., & Hastuti, N. R. (2021). OPTIMALISASI BEBAN KERJA PADA INDUSTRI MAKANAN MENGGUNAKAN METODE WORKLOAD ANALYSIS (Studi Kasus pada UD. MR-Jember). Jurnal Ilmiah Rekayasa Pertanian Dan Biosistem, 9(2), 118–129. https://doi.org/10.29303/jrpb.v9i2.219

Tarwaka, & Bakri, S. H. A. (2016). Ergonomi untuk Keselamatan, Kesehatan Kerja dan Produktivitas. http://shadibakri.uniba.ac.id/wp-content/uploads/2016/03/Buku-Ergonomi.pdf

Wignjosoebroto. (2003). Pengantar Teknik & Manajemen Industri (Gunarta (ed.); 1st ed.). Guna Widya.

Wignjosoebroto. (2006). ERGONOMI Studi Gerak dan Waktu (Gunarta (ed.); 4th ed.). Guna Widya.

Downloads

Published

2026-01-03

How to Cite

Wibawa, F. N. A., & Satoto, H. F. (2026). Analisis Waktu Standar untuk Menentukan Jumlah Tenaga Kerja dalam Memenuhi Permintaan Produksi Kerupuk Puli di UD. XYZ. Jurnal Teknik Industri Terintegrasi (JUTIN), 9(1), 59–66. https://doi.org/10.31004/jutin.v9i1.52061