Integrating Value Stream Mapping, Waste Assessment Model, and Root Cause Analysis to Improve Loading–Unloading Efficiency at PT XYZ
DOI:
https://doi.org/10.31004/jutin.v8i3.49182Keywords:
Loading unloadig, Value Stream Mapping, Waste Assessmen Model, Root Cause Analysis, Operational EfficiencyAbstract
The loading and unloading process often becomes a bottleneck in the distribution of bottled drinking water due to excessive waiting time. This study aims to identify and minimize such delays using Value Stream Mapping (VSM). To strengthen the analysis, the Waste Assessment Model (WAM) was applied to examine the interrelationships among different types of waste, while Root Cause Analysis (RCA) was employed to uncover the main contributing factors. The study was conducted at a bottled water company experiencing significant delays in queuing and inspection stages. Following the implementation of improvement measures, time efficiency increased by 17.53%. The findings demonstrate that accurately identifying waste can enhance operational efficiency, streamline workflow, and enable the company to operate more productively.References
Arbelinda, K., & Rumita, R. (2017). Penerapan Lean Manufacturing pada Produksi Itc CV. Mansgroup dengan Menggunakan Value Stream Mapping dan 5s. Industrial Engineering Online Journal, 6(1), 1–10.
Brilianto, R., & Waluyowati, N. P. (2024). Analisis Proses Produksi Dengan Value Stream Mapping Pada Industri Manufaktur. Jurnal Kewirausahaan Dan Inovasi, 3(4), 1095–1103. https://doi.org/10.21776/jki.2024.03.4.14
Fatma, N. F., Ponda, H., & Sutisna, E. (2022). Penerapan Lean Manufacturing Dengan Metode Value Stream Mapping Untuk Mengurangi Waste Pada Proses Pengecekan Material Bahan Baku Ke Lini Produksi. Journal Industrial Manufacturing, 7(1), 41. https://doi.org/10.31000/jim.v7i1.5969
Khunaifi, A., Rangga Primadasa, & Sugoro Bhakti Sutono. (2022). Implementasi Lean Manufacturing untuk Meminimasi Pemborosan (Waste) Menggunakan Metode Value Stream Mapping di PT. Pura Barutama. Jurnal Rekayasa Industri (JRI), 4(2), 87–93. https://doi.org/10.37631/jri.v4i2.560
Kihel, Y. El, Kihel, A. El, & Embarki, S. (2022). Optimization of the Sustainable Distribution Supply Chain Using the Lean Value Stream Mapping 4.0 Tool: A Case Study of the Automotive Wiring Industry. Processes, 10(9). https://doi.org/10.3390/pr10091671
Nowak, M., Pfaff, H., & Karbach, U. (2017). Does Value Stream Mapping affect the structure, process, and outcome quality in care facilities? A systematic review. Systematic Reviews, 6(1), 1–11. https://doi.org/10.1186/s13643-017-0563-y
Rusmawan, H. (2020). Perancangan Lean Manufacturing Dengan Metode Value Stream Mapping (VSM) Di PT Tjokro Bersaudara (PRIOK). Jurnal Optimasi Teknik Industri (JOTI), 2(1), 30. https://doi.org/10.30998/joti.v2i1.4128
Saraswat, P., Kumar, D., & Kumar Sain, M. (2015). Reduction of Work in Process Inventory and Production Lead Time in a Bearing Industry Using Value Stream Mapping Tool. International Journal of Managing Value and Supply Chains, 6(2), 27–35. https://doi.org/10.5121/ijmvsc.2015.6203
Suryaningrat, I., Purnomo, B., & Fatimah. (2022). Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT. Jurnal Argointek, 16(4), 599–610. https://doi.org/10.21107/agrointek.v16i4.12110
Tyagi, S., Choudhary, A., Cai, X., & Yang, K. (2015). Value stream mapping to reduce the lead-time of a product development process. International Journal of Production Economics, 160, 202–212. https://doi.org/10.1016/j.ijpe.2014.11.002
Yola, M., Wahyudi, F., & Hartati, M. (2017). Value Stream Mapping untuk Mereduksi Waste Dominan dan Meningkatkan Produktivitas Produksi di Industri Kayu. Jurnal Teknik Industri, 3(2), 112–118.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Enik Sulistyowati, Madinatul Munawaroh

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

