Manajemen pemeliharaan mesin filler menggunakan metode Overall Equipment Effectiveness di production house area nursery PT. RAPP
DOI:
https://doi.org/10.31004/jutin.v8i1.42019Keywords:
Maintenance, OEE, Six Big LoossesAbstract
Maintenance system is an activity conducted to ensure that machines or equipment are always ready to use. PT. RAPP uses a filler machine in the nursery area to fill cocopeat media into trays. The filler machine works optimally at a capacity of 600 kg (multiplied by two cycles) to fill 180 trays per day. When experiencing damage, this filler machine can only be used at a capacity of 300 kg (multiplied by four cycles) to fill 150-165 trays per day. To reduce machine downtime when there is damage, the implementation of machine maintenance management is needed. OEE is a method used to calculate machine effectiveness based on availability, performance, and quality. Using data from May 2022 to April 2023, the average OEE value obtained is 60.66%, indicating that the filler machine performance is below the standard of 85%. The calculation of the Six Big Losses shows that the values affecting machine performance are breakdown losses with a time loss of 22,825 minutes, rework losses with a time loss of 15.8 minutes, and setup and adjustment with a time loss of 41.8 minutes, indicating that the largest factor and the main cause affecting the OEE value of the filler machine is breakdown losses, which reduces the production rate.References
Abdul R, Nanang B, Jojo S. 2022. Analisis perawatan elematic extrude E9 dan elematic SAW5-400 guna meningkatkan kinerja perusahaan dengan metode Total Productive Maintenance di PT XYZ. Jurnal Pendidikan Teknik Mesin. 9(1):39-50.
Agung P, Fadhly AK, Ade IW. 2020. Analisis penerapan Total Productive Maintenance (TPM) melalui metode Overall Equipment Effectiveness (OEE) pada mesin packer di Pabrik Semen PT XYZ. Jitekh. 8(1):11-21.
Ahmadi, Noor, Nur YH. 2017. Analisis pemeliharaan mesin blowmould dengan metode RCM di PT. CCAI. Jurnal Optimasi Sistem Industri. 16(2):42-56.
Albert WPS. 2020. Studi penerapan Total Productive Maintenance (TPM) untuk peningkatan efisiensi pada pabrik pupuk organik PT Agro Energi Indonesia. [Skripsi]. Medan: Universitas Medan Area.
APRIL Learning Institut. 2023. Welcome ro the Riau Andalan Pulp and Paper.
Pangkalan Kerinci : RAPP.
Fadli M. 2020. Usulan penjadwalan pergantian komponen kritis mesin press menggunakan Reliabilty Centered Maintenance PT. Pulau Sambu Kuala Enok. [Skripsi]. Pekanbaru: UIN Sultan Syarif Kasim.
Andita R. 2014. Evaluasi efektivitas mesin klin dengan penerapan Total Productive Maintenance pada pabrik II/III PT Semen Padang. Jurnal Optimaasi Sistem Industri. 13(1):454-485.
Anik R, Junaidi A. 2019. Analisis efektivitas mesin expeller dengan implementasi TPM (Total Productive Maintenance) di PT Wilmar Nabati Indonesia Gresik. Kaizen : Management Systems & Industrial Engineering Journal. 2(2):76-82.
Asyrof A. 2018. Penerapan Total Productif Maintenance dengan menggunakan metode Overall Equipment Effectiveness (studi kasus : PT Triangle Motorindo. [Skripsi]. Yogyakarta: Universitas Islam Indonesia.
Haming M, Nurnajamuddin M. 2019. Manajemen Produksi Modern Operasi Manufaktur dan Jasa Buku kedua, Edisi Ketiga. Jakarta: PT. Bumi Aksara.
Haryono L. 2016. Penerapan Total Productive Maintenance dengan pendekatan Overall Equipment Effectiveness dan penentuan kebijakan maintenance pada mesin ring frame divisi spinning I di PT Pisma Putra Textile. [Skripsi]. Semarang: Universitas Dipenegoro.
PT RAPP. 2019. Modul Welcome To The Nursery Bussines Unit. Pangkalan Kerinci: Riau Fiber Media.
PT RAPP. 2020. Kumpulan Materi Production House Area. Nursery and forestry.
Pangkalan Kerinci: Riau Fiber Media.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Widya Laila, Regita Cahyani, Fadli Arsi, Arief Fazlul Rahman, Salman Alfarisi

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.