Abstract

The construction project of the PKK Office Building, Dekranasda, and UMKM Center in Makassar City has a strategic role in supporting economic growth and improving public services. The purpose of this study was to analyze the productivity of heavy equipment used in this work. The results showed that the excavator and mobile crane heavy equipment in the 8th year, the truck mixer in the 5th year, while the dump truck and concrete pump in the 4th year, each had a value smaller than per year. Productivity analysis showed that the Komatsu PC 200 Excavator heavy equipment had a total cycle time of 11 minutes, the 4 m³ type Dump Truck was more efficient with a cycle time of 5.6 minutes compared to the 8 m³ type, and the XCMG QY25K Mobile Crane showed high efficiency with a total cycle time of 3.124 minutes. Meanwhile, the Truck Mixer had the longest cycle time, which was 136.7 minutes, so it requires better time management

References

Ariadi, I. K., Yana, A. A. G. A., & Dewi, A. D. P. (2021). Optimasi Kombinasi Alat Berat Pada Proyek Pembangunan Gedung RSUD Sanjiwani Gianyar. Jurnal Spektran, 9(2), 107.

Ahen, F., Nuh, S. M., & Indrayadi, M. (2021). Analisis Perbandingan Biaya dan Waktu Metode Pelaksanaan Beton Cast in Situ dengan Precast pada Pekerjaan Fondasi Tiang Pancang. JeLAST: Jurnal PWK, Laut, Sipil, Tambang, 8(2).

Chalik, C. A., Thamsi, A. B., & Arizal, A. (2023). Produktivitas kerja alat bor pada kegiatan pengeboran eksplorasi nikel laterit di pt hoffmen international. Jurnal Pertambangan, 7(1), 33-38.

Danu, M. Y., Bachmid, S., & Anies, M. K. (2019). Analisis Produktivitas Pekerja Konstruksi Jalan Raya Pada Malam Hari. Jurnal Ilmiah Mahasiswa Teknik Sipil, 54-59.

Fahri, M., Ashad, H., & Watono. (2022). Pengaruh Faktor-Faktor Produktivitas Tenaga Kerja Dalam Pembangunan Gedung Tinggi Di Parepare. Jurnal Teknik Sipil MACCA, 7(1), 66-74.

Hamzah, E. (2022). Analisis Kinerja Biaya dan Waktu Pelaksanaan Konstruksi Akibat Perubahan Desain. Jurnal Konstruksi: Teknik, Infrastruktur dan Sains, 1, 25-36.

Kasmaida, Ashad, H., & Musa, R. (2020). Analisis Produktifitas Tenaga Kerja Pada Pekerjaan Proyek Pembangunan Embung Dan Jaringan Air Baku Kota Parepare. 4(1), 49-58.

M., J., Irfan, & dkk. (2022). Kajian Percepatan Durasi Pelaksanaan Pembangunan Gedung Utama Kantor Kementerian Agama Kabupaten Mamuju Pasca Gempa Provinsi Sulawesi Barat. Jurnal Konstruksi : Teknik, Infrastruktur dan Sains, 1(6), 20-29.

Ramdhani, M. I., & Johari, G. J. (2020). Analisis Produktivitas Pemakaian Alat Berat Terhadap Biaya dan Waktu pada Pembangunan Jalan Baru Lingkar Cipanas Kabupaten Garut. Jurnal Konstruksi, 18(2), 62-71.

Said, I., Hadi, A. K., & Musa, R. (2022). Produktivitas Alat Berat Dengan Metode Garis Lurus Pada Proyek Pembangunan Stadion Bawela Tahap III Kota Sorong. Jurnal Konstruksi: Teknik, Infrastruktur Dan Sains, 01(11), 1-10.

Sarya, G., & Maulana, R. (2022). Analisis Produktivitas Alat Berat Proyek Cut And Fill Pada Cluster Silver Sand Tahap 1 Puncak Tidar Malang. Jurnal Kacapuri : Jurnal Keilmuan Teknik Sipil, 5(1), 252.

Setiawati, D. N., & Meddeppungeng, A. (2013). Analisis produktivitas alat berat pada proyek pembangunan pabrik krakatau posco zone IV di Cilegon. Konstruksia, 4(2).

Wardah, B., Ashad, H., & BP, I. (2017). Analisis Keterlambatan Proyek Jalan Usilimo – Karubaga – Mulia Ii Kab.Puncak Jaya Provinsi Papua. 1(1), 0-7.

Sani, K. R. (2013). HUBUNGAN PERENCANAAN DAN PARTISIPASI MASYARAKAT TERHADAP KEBERHASILAN PEMBANGUNAN DI KELURAHAN PASIR PUTIH KECAMATAN SINJAI BORONG KABUPATEN SINJAI. Jurnal Ilmiah Administrasita', 3(2), 74-90.

Roekminiati, S., & Sunarya, A. (2024). Efektivitas Penanganan Ketertiban Bangunan Liar (Studi Pelebaran Jalan Raya Manyar Kabupaten Gresik). Soetomo Administrasi Publik, 2(3), 731-744.

Sune, U. (2019). Kinerja Kepala Desa dalam Pembangunan Infrastruktur Desa Sidorukun Kecamatan Randangan Kabupaten Pohuwato. Madani Jurnal Politik Dan Sosial Kemasyarakatan, 11(3), 218-245.

Downloads

Published

2025-01-17

How to Cite

Rasyid, M. A., Hadi, A. K., & Supardi, S. (2025). Kajian produktivitas alat berat pada proyek pembangunan gedung Kantor PKK, Dekranasda dan UMKM Center Kota Makassar. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(1), 840–850. https://doi.org/10.31004/jutin.v8i1.40964

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 > >> 

You may also start an advanced similarity search for this article.