Identifikasi Waste Guna Mengefisiensikan Proses Produksi Castable di PT. Benteng Api Technic Gresik

Authors

  • Etika Devi Novitasari Universitas 17 Agutus 1945 Surabaya
  • Hery Murnawan Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.31004/jutin.v7i2.27948

Keywords:

Castable, Wasting time, Proses

Abstract

PT Benteng Api Technic was founded in 1997 and produces refractory bricks, refractory cement and various refractory materials. Refractory cement or castable currently still uses a pre-order system before the production process is carried out. During observations for seven days with 38 observations, there were activities that were felt to be less efficient, then the value stream mapping method was carried out to streamline waste. The result is a defect when the production process is finished, there is a repetition of the production process because it does not pass the feasibility test, processing because a lot of leftover material falls in the bagging section and the material is no longer used. Waiting is the average part of weighing materials/products of 1.54 seconds (waiting for the material composition recipe and weighing platform trouble/error). Material mixing section with an average/product of 1.82 seconds (waiting for machine repairs due to leaking air duct). Total production lead time is 3396 seconds. Once the waste is identified, the next step is to eliminate the activity by testing data adequacy and testing data uniformity. The results of the analysis of the castable production process contained 2 analyses, the first analysis by reducing activity time with an average total time of 3285 seconds/44 cement and the second analysis by reducing and eliminating the cement weighing activity in the bagging section with a total time of 2873 seconds/44 cement

References

Chatab, N. (2019). Oraganisasi dan Manajemen Perusahaan Industri. CV Alfabeta Bandung.

Handoko, T, H., (2017). Dasar-dasar Manajemen Produksi dan Operasi. BPFE-YOGYAKARTA.

Rosyidah, M., & Ismariani, R. (2022). Lean Manufacturing: Langkah Pengurangan Pemborosan dalam Produksi. Grup Penerbitan CV BUDI UTAMA, Sleman

Tjakraatmadja, H, J., Anggawisastra, R., Sutalaksana, Z, I. (2012). Teknik Perancangan Sistem Kerja 2. Bisnis Keuangan Manajemen, ITB Bandung

Downloads

Published

2024-04-22

How to Cite

Novitasari, E. D., & Murnawan, H. . (2024). Identifikasi Waste Guna Mengefisiensikan Proses Produksi Castable di PT. Benteng Api Technic Gresik. Jurnal Teknik Industri Terintegrasi (JUTIN), 7(2), 1195–1201. https://doi.org/10.31004/jutin.v7i2.27948

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.