Penentuan Tenaga Kerja Optimal Pada Stasiun Pengemasan PT. PQRS Berdasarkan Perhitungan Waktu Standart Metode Work Sampling
DOI:
https://doi.org/10.31004/jutin.v7i1.24198Keywords:
Work Sampling, Labor, Standard Time, Production CapacityAbstract
PT. PQRS is an agro-industrial company that plays a role in processing fresh tea leaves into various ready-to-consume tea products. Because there is no definite time standard for the production process, the corporation cannot accurately estimate the number of workers needed based on the workload at each work station, especially the packaging station. It is hoped that by combining the work sample approach with conventional time measurement methods, the author will assist businesses in identifying the ideal number of workers. The average time for packaging tea during 60 observations was 219.94 seconds, and the average working time was 480 minutes or 28,800 seconds or 8 hours a day, according to calculations that had been carried out. The number of workers in the tea packaging section is based on labor requirements calculated using a work sampling approach. According to the calculation of labor requirements using the work sampling method, the number of employees in the tea packaging section, which previously required 21 employees, has now become 18 employees at the PT.PQRS tea packaging stationReferences
Diniaty, D. (2018). Penentuan Jumlah Tenaga Kerja Berdasarkan Waktu Standar Dengan Metode Work Sampling Di Stasiun Repair Overhoul Gearbox (Studi Kasus: PT. IMECO Inter Sarana). Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 3(1), 1. https://doi.org/10.24014/jti.v3i1.5557
Handoko, S., Putri, N. T., & Jonrinaldi, J. (2017). Penerapan Sampling Kerja dalam Penentuan Beban dan Kebutuhan Tenaga Kerja. Jurnal Optimasi Sistem Industri, 16(2), 140. https://doi.org/10.25077/josi.v16.n2.p140-149.2017
Hartati, R., & Zuriati, P. (2018). Penentuan Jumlah Tenaga Kerja yang Optimal pada Departemen Tata Kelola dan Kepatuhan dengan Metode Work Sampling di PT. Pupuk Iskandar Muda. Jurnal Optimalisasi, 4(1), 30–37.
Hudaningsih, N., Mashabai, I., & Prayoga, R. (2019). Analisa Pengukuran Beban Kerja dengan Metode Stopwatch Time Study dan FTE di UD. Prasetya Rangga. Tekinfo: Jurnal Ilmiah Teknik Industri Dan Informasi, 8(1), 50–63. https://doi.org/10.31001/tekinfo.v8i1.697
Hudaningsih, N., & Prayoga, R. (2019). Analisis Kebutuhan Karyawan Dengan Menggunakan Metode Full Time Equivalent ( FTE ) Pada Departemen Produksi PT. Borsya Cipta Communica. Jurnal Tambora, 3(2), 98–106.
Jayusman, I., & Shavab, O. A. K. (2020). Aktivitas Belajar Mahasiswa Dengan Menggunakan Media Pembelajaran Learning Management System (Lms) Berbasis Edmodo Dalam Pembelajaran Sejarah. Jurnal Artefak, 7(1), 13. https://doi.org/10.25157/ja.v7i1.3180
Maretno, A., & Haryono, H. (2015). Analisa Beban Kerja Fisik Dan Mental Dengan Menggunakan Work Sampling Dan NASA-TLX Untuk Menentukan Jumlah Operator. Dinamika Rekayasa, 11(2), 55–63.
Nando, F., & Laila, W. (2022). Penentuan Jumlah Kebutuhan Tenaga Kerja pada Stasiun Kerja Composer Dengan Menggunakan Metode Work Sampling di PT. Asia Forestama Raya. Journal of Engineering Science and Technology Management, 2(2), 2828–7886. https://jes-tm.org/
Nevenda, M., Mei, L., Wulandari, C., Katolik, U., & Cendika, D. (2023). Menentukan Jumlah Tenaga Kerja Optimal Pada Proses Produksi Pt . Nrz Prima Gasket. 1(5), 211–222.
Rahayu, M., & Juhara, S. (2020). Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. Unistek, 7(2), 93–97. https://doi.org/10.33592/unistek.v7i2.650
Sabilah, A. I., & Daonil, D. (2023). Analisis Beban Kerja Karyawan dan kebutuhan Karyawan pada Divisi Pengelasan di PT TI. Blend Sains Jurnal Teknik, 1(3), 251–258. https://doi.org/10.56211/blendsains.v1i3.207
Suroso, H. C., & Yulvito, Y. (2020). Analisa Pengukuruan Waktu Kerja guna Menentukan Jumlah Karyawan Packer di PT. Sinarmas Tbk. Jurnal IPTEK, 24(1), 67–74. https://doi.org/10.31284/j.iptek.2020.v24i1.906
Syarifuddin, S., Fahrunnisa, F., & ... (2022). Analisis Jumlah Kebutuhan Karyawan Krani Dengan Menggunakan Metode Full Time Equivalent Di Pt. Perkebunan Nusantara Iii Pks …. … Engineering Journal, 11(1). https://journal.unimal.ac.id/miej/article/view/730%0Ahttps://journal.unimal.ac.id/miej/article/download/730/408
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Rizka Triannisa, Sinta Dewi
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.