Pemetaan Prioritas Risiko pada Proyek PT. ABC menggunakan Analytical Hierarchy Process
DOI:
https://doi.org/10.31004/jutin.v8i4.51019Keywords:
AHP, Contractor, Risk Management, Renovation Project, Risk PriorityAbstract
PT. ABC, as a contractor engaged in renovation work, faces several operational constraints. This study focuses on determining the priority sequence of renovation project risks using the Analytical Hierarchy Process (AHP) approach. Data collection was conducted through interviews and distributed pairwise comparison questionnaires to experts. From the identification process, ten types of risks deemed critical were recorded. Based on AHP processing, the top three risks requiring attention are Inaccurate Budget Planning (33.12%), Surge in Material Prices (16.94%), and Errors in Material Specifications (14.42%). The Consistency Ratio (CR) value of 0.040 indicates that the assessments provided are consistent. The implication of this study emphasizes financial and technical-material aspects as the most urgent areas requiring immediate attention. The proposed recommendations include improving the cost estimation system and strengthening material supply governance. The results of this study are expected to serve as a reference in formulating mitigation strategies and resource allocation more effectively.References
Anggraeni, D. P., & Prambodo, Y. L. (2024). Model Analytical Hierarchy Process (AHP) untuk Rekomendasi Smartphone Berdasarkan Preferensi Pengguna Gen Z. Jurnal Krisnadana, 4(1), 17–27. https://ejournal.sidyanusa.org/index.php/jkdn
Habsari, W., Djatna, T., Udin, F., & Arkeman, Y. (2022). A Multi-Criteria Decision-Making Approach Using Ahp for Pudak Packaging Supplier Selection. Jurnal Teknologi Industri Pertanian, 32(158), 197–203. https://doi.org/10.24961/j.tek.ind.pert.2022.32.2.197
Mohamad, S., Fais, M. A., Retno, D., Dewi, S., & Mulyono, J. (2025). Membangun Rantai Pasok Berkelanjutan Produk Ikan Bandeng untuk Menunjang Kelancaran Proses Transportasi. Widya Teknik, 24(1). https://doi.org/10.1093/benz/9780199773787.article.b00008186
Mohamad, S., Lahay, I. H., Lapai, Y., Fais, M. A., Prayogo, L. F., & Artikel, S. (2024). Pemodelan Supply Chain Resilience Risk Management Menggunakan Metode FMEA Berbasis Macroergonomic Analysis and Design INFORMASI ARTIKEL ABSTRAK. Jurnal INTECH Teknik Industri Universitas Serang Raya, 10(2), 113–120. http://dx.doi.org/10.30656/intech.v10i2.7896
Prasetyono, P. N., & Dani, H. (2022). Identifikasi Risiko pada Pekerjaan Proyek Konstruksi Bangunan Gedung sebagai Tempat Tinggal. Publikasi Riset Orientasi Teknik Sipil (Proteksi), 4(1), 42–47. https://doi.org/10.26740/proteksi.v4n1.p42-47
Umboh, A. H., Malingkas, G. Y., & Rumayar, A. L. E. (2021). Pemodelan Pengelolaan Risiko Proyek Konstruksi Oleh Perusahaan Pelaksana Konstruksi (Studi Kasus Proyek Konstruksi Di Pemerintah Daerah Kabupaten. Jurnal Ilmiah Media …, 11(2), 145–157.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Richard Renaldy, Wildan Wildan, Alfikar Marpaung, Silvana Mohamad, Yusrin R Paudi

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

