Lean Manufacturing, Waste Reduction, Production Efficiency, 5S, Value Stream Mapping

Abstract

PT XYZ is a metal manufacturing company that produces various components based on Make to Stock and Make to Order systems. However, the company faces efficiency challenges, particularly on the production line for oil palm pole clamps, where significant time and energy waste leads to customer delivery delays. This study applies the lean manufacturing approach to identify and reduce this waste. Process analysis successfully identified three dominant types of waste: motion, inventory, and waiting, with motion being the largest contributor at 21.66%. Based on these findings, a series of improvements were proposed, including standardized work procedures, 5S implementation, visual management, and operator training. The implementation of these proposals resulted in a 10.55% improvement in total production process efficiency. This gain was achieved entirely by eliminating Non-Value Added (NVA) activities, without altering core Value-Added (VA) processes.

References

Heizer, J., & Render, B. (2017). Operations Management: Sustainability and Supply Chain Management. (D. E. Irawan (ed.); 11th ed.). Pearson.

Rother, M., & Shook, J. (2003). Learning to See: Value Stream Mapping to Add Value and Eliminate Muda (Lean Enterprise Institute). In Lean Enterprise Institute Brookline (p. !). http://www.leanenterprises.com/Library/Learning_to_See_Foreword.pdf

Christie, Andrew W., and Beth M. Foederer. 2009. “Tools for Process Improvement.” Society of Plastics Engineers - International Polyolefins Conference - FLEXPACKCON 2009 2: 739–98.

David, Nineveh. 2014. “Going Lean.” Australian Journal of Pharmacy 95(1124): 42–46. doi:10.1097/01.jnn.0000358162.21072.ab.

Gokberk, Hasan, Sevilay Demirkesen, and Chengyi Zhang. 2023. “A Lean Construction and BIM Interaction Model for the Construction Industry School of Planning , Design , and Construction , Michigan State University , East Department of Civil Engineering , Gebze Technical University , Kocaeli , Turkey Department of Con.” Production Planning & Control 34(15): 1447–74.

Hines, Peter, and Nick Rich. 1997. “The Seven Value Stream Mapping Tools.” International Journal of Operations and Production Management 17(1): 46–64. doi:10.1108/01443579710157989.

Jeffrey K., Liker. 2004. “An Executive Summary and Assessment of the 14 Principles.” (January 2004).

Juran, Joseph M, A Blanton Godfrey, Robert E Hoogstoel, and Edward G Schilling. 1998. JURAN ’ S QUALITY HANDBOOK. 5th ed. New York: McGraw-Hill.

Meyers, Fred E, and James R Stewart. 2001. Motion and Time Study for Lean Manufacturing. Subsequent. Pearson College.

Montgomery, Douglas C. 2009. Statitical Quality Control: A Modern Introduction. 7th ed. John Wiley and Sons.

Niebel, Benjamin W, and Andris Freivalds. 2009. Niebel’s Methods, Standards, and Work Design. Boston: McGraw-Hill Higher Education.

Rawabdeh, Ibrahim A. 2005. “A Model for the Assessment of Waste in Job Shop Environments.” International Journal of Operations and Production Management 25(8): 800–822. doi:10.1108/01443570510608619.

Sutalaksana, Iftikar Z, Ruhana Anggawisastra, and Jann H. Tjakraamadja. 2006. Teknik Perancangan Sistem Kerja. 2nd ed. Bandung: ITB Press.

Tarwaka, and Solichul H A Bakri. 2016. Ergonomi Untuk Keselamatan, Kesehatan Kerja Dan Produktivitas. http://shadibakri.uniba.ac.id/wp-content/uploads/2016/03/Buku-Ergonomi.pdf.

Wignjosoebroto, Sritomo. 2008. Ergonomi, Studi Gerak Dan Waktu. Jakarta: Guna Widya.

Womack, J P, and D T Jones. 1997. “Lean Thinking—Banish Waste and Create Wealth in Your Corporation.” Journal of the Operational Research Society 48(11): 1148–1148. doi:10.1038/sj.jors.2600967

Downloads

Published

2025-07-04

How to Cite

Kurniawan, M. A., & Mundari, S. (2025). Reduksi Pemborosan pada Proses Produksi Klem Galah Sawit dengan Pendekatan Lean Manufacturing (Studi Kasus: PT. XYZ). Jurnal Teknik Industri Terintegrasi (JUTIN), 8(3), 2668–2675. https://doi.org/10.31004/jutin.v8i3.46547

Issue

Section

Articles of Research

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>