Strategi untuk Meningkatkan Capaian Target Produksi Departemen Finishing dengan Metode 8 Waste di PT. XYZ

Authors

  • Vicky Ferdiansyah Universitas Dian Nuswantoro
  • Dwi Nurul Izzhati Universitas Dian Nuswantoro

DOI:

https://doi.org/10.31004/jutin.v8i2.44540

Keywords:

Production Targets, Lean Manufacturing, 8 Waste, 5 Whys

Abstract

PT XYZ faces the problem of not achieving production targets in five departments, especially in the Finishing Department with an achievement of only 54%. This study aims to identify the most dominant waste and provide suggestions for improvement. The methods used include interviews and giving 8 waste questionnaires to five respondents. Then, the most dominant type of waste was determined using a Pareto diagram. After that, root cause analysis was conducted using the 5 Whys method and suggestions for improvement were given. The results show that the dominant type of waste is waiting, caused by waiting for materials as needed, process queues due to the limited number of workers, and difficulty finding materials in an unorganized work area. The proposed improvements include improving communication with suppliers regarding material specifications, improving labor schedules and providing counseling and training on the application of the 5 S/R culture. With these proposed improvements, it is expected to increase the achievement of production targets in the Finishing department of PT XYZ.

References

Annai Nashida, A., & Syahrullah, Y. (2021). Perbaikan Kualitas Pada Proses Produksi Kabel Type NYA dengan Metode Quality Control Circle (QCC) Pada Perusahaan Manufaktur Kabel di Banyumas. JURMATIS (Jurnal Manajemen Teknologi Dan Teknik Industri), 3(2), 147. https://doi.org/10.30737/jurmatis.v3i2.1792

Aulia Rohani, Q., & Suhartini. (2021). Analisis Kecelakaan Kerja dengan Menggunakan Metode Risk Priority Number, Diagram Pareto, Fishbone, dan Five Why’s Analysis. Seminar Nasional Teknologi Industri Berkelanjutan I (SENASTIAN 1), 136–143.

Febrianty, T. B., Hermansyah, F. A., Syafiin, I. A. S., & Fauzi, M. (2022). Identifikasi Jenis Pemborosan Yang Terjadi Pada Pt.Pqr Dengan Menggunakan Metode 8 Waste. Jurnal Ilmiah Teknik Dan Manajemen Industri, 2(1), 94–101. https://doi.org/10.46306/tgc.v2i1.28

Fhadillah, I., Anggraeni, N. F., & Awaliah Sugiarto, A. R. (2020). Analisis Pemborosan Di Pt. Xyz Menggunakan 8 Waste. Jurnal Ilmiah Teknologi Infomasi Terapan, 6(2), 157–162. https://doi.org/10.33197/jitter.vol6.iss2.2020.335

Moengin, P., & Ayunda, N. (2021). Lean Manufacturing untuk Meminimasi Lead Time dan Waste agar Tercapainya Target Produksi (Studi kasus: PT. Rollflex Manufacturing Indonesia). Jurnal Teknik Industri, 11(1), 77–92. https://doi.org/10.25105/jti.v11i1.9699

Prasmita, L. D., Yastica, T. V., & Caesaron, D. (2024). Minimasi Waste Motion Menggunakan Metode 5S Pada Produksi Konsentrat Kopi XYZ Dengan Pendekatan Lean Manufacturing. Journal of Industrial Engineering and Operation Management (JIEOM), 7(2), 102-112.

Rante, R., Sutrisno, A., & Neyland3, J. S. . (2017). PENGUKURAN KINERJA BERBASIS DAMPAK WASTE DALAM KEGIATAN PERAWATAN TOWER TELEKOMUNIKASI Rein Aris Rante 1 ) , Agung Sutrisno 2 ) , Johan S.C Neyland 3 ) Jurusan Teknik Mesin Universitas Sam Ratulangi. Online Poros Teknik Mesin, 6, 239–254.

Ravizar, A., & Rosihin, R. (2018). Penerapan Lean Manufacturing untuk Mengurangi Waste pada Produksi Absorbent. Jurnal INTECH Teknik Industri Universitas Serang Raya, 4(1), 23. https://doi.org/10.30656/intech.v4i1.854

Rusmiati, E., Ambarwati, L., & Santoni, D. (2023). Edukasi 5S dalam Upaya Continuous Improvement Melalui Audit 5S Pada PT Inti Ganda Perdana (IGP). Journal of Community Services in Sustainability, 1(1), 9–18. https://doi.org/10.52330/jocss.v1i1.144

Sumasto, F., Akbar, M. R., Husna, S. F. H., Pratama, I. R., Wulansari, I., Rozi, M. F., & Ismono, A. (2023). Peningkatan Value Added dalam Industri Tahu melalui Penerapan Lean Manufacturing dan Analisis Waste. Jurnal Serambi Engineering, 8(4). https://doi.org/10.32672/jse.v8i4.6876

Tanuwijaya, A., & Purwanggono, B. (2015). Penerapan Metode 5S dan Perancangan Fasilitas Peletakkan Material dan Peralatan Guna Eliminasi Waste Of Motion Dalam Perakitan Generator Set (Studi Kasus PT. Berkat Manunggal Jaya). Industrial Engineering Online Journal, 4(1), 1–7.

Wirawan, E., & Minto. (2021). Penerapan Metode PDCA dan 5 Why Analysis pada WTP Section di PT Kebun Tebu Mas. Jurnal Penelitian Bidang Inovasi & Pengelolaan Industri, 1(01), 1–10. https://doi.org/10.33752/invantri.v1i01.1825

Zalmawati, W. O., Utomo, M. N. Y., & Nur, R. (2022). Sistem Pendukung Keputusan Berbasis Metode Korelasi untuk Menganalisis Penyebab Tidak Tercapainya Target Produksi Batu Bara di PT XYZ. Seminar Nasional Teknik Elektro Dan Informatika (SNTEI), 152–157. https://www.researchgate.net/publication/368756053

Downloads

Published

2025-04-10

How to Cite

Ferdiansyah, V., & Izzhati, D. N. (2025). Strategi untuk Meningkatkan Capaian Target Produksi Departemen Finishing dengan Metode 8 Waste di PT. XYZ. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(2), 2005–2010. https://doi.org/10.31004/jutin.v8i2.44540

Issue

Section

Articles of Research

Similar Articles

<< < 6 7 8 9 10 11 12 13 14 15 > >> 

You may also start an advanced similarity search for this article.