Analisis penyebab demurrage pada proses bongkar muat material impor proyek kapal x dengan metode six sigma DMAIC (Studi kasus: PT ABC)

Authors

  • Yasmine Azalia Wandana Fakultas Teknik dan Sains, Universitas Pembangunan Nasional Veteran Jawa Timur
  • Nur Rahmawati Universitas Pembangunan Nasional Veteran Jawa Timur, Indonesia

DOI:

https://doi.org/10.31004/jutin.v8i1.38819

Keywords:

Demurrage, DMAIC, Six Sigma, Unloading

Abstract

PT ABC is one of the industry that produce ships. In the production of Ship X, PT ABC needs imported materials sent from other country. In the process of loading and unloading these materials, PT ABC encounters operational difficulties that cause demurrage. This study aims to identify the causes of demurrage and provide suggestions for improvements to minimize the occurrence of demurrage in the next loading and unloading process. The method used in this research is the six sigma method which consists of five stages, namely define, measure, analyze, improve, and control. The results showed that there were 10 causes of demurrage in the loading and unloading process of Ship X materials during 2022. In addition, there are 3 most dominant causes of demurrage, namely late receipt of documents (36.84%), document discrepancies (15.79%), and waiting for the signature of related parties (10.53%). The recommended actions to minimize the occurrence of demurrage include implementing more efficient SOP and improving communication between internal and external stakeholders.

References

Hanifah, P., & Iftadi, I. (2022). Penerapan Metode Six Sigmadan Failure Mode Effect Analysisuntuk Perbaikan Pengendalian Kualitas Produksi Gula. Jurnal INTECH Teknik Industri Universitas Serang Raya, 8(2). doi:https://doi.org/10.30656/intech.v8i2.4655

Hidayah, N. I., Aisah, D. N., & Syabriani, A. Y. (2023). Hambatan Bongkar-Muat Kapal dalam Kegiatan Ekspor-Impor di Pelabuhan Tanjung Priok Jakarta. Jurnal Ilmiah Ekonomi dan Manajemen, 1(4), 50-66. doi:https://doi.org/10.61722/jiem.v1i4.288

Nasution, D., Hasibuan, A., & Sibuea, S. (2023). Pengendalian Kualitas CPOuntuk Meminimumkan ALB Menggunakan Metode DMAIC. Jurnal Teknik, 1(4). doi:https://doi.org/10.56211/blendsains.v1i4.190

Pratama, A., & Nugraha, I. (2023). Analisis Penyebab Sisa Pipa Produksi Kapal X Menggunakan New Seven Tools Dan FMEA : (Studi Kasus : PT. KRS). Jurnal Pendidikan Tata Niaga, 12(1). doi:https://doi.org/10.26740/jptn.v12n1.p47-57

Ramadan, M. (2022). Desain Kapal Bantu Untuk Mengangkut Kontainer Menggunakan Software Sketch Up. Jurnal Riset Sains Dan Teknologi Kelautan, 5(1). doi:https://doi.org/10.62012/sensistek.v5i1.19376

Zai, I., Feblicia, S., Aqmi, A., & Rahmah, A. (2022). Analisis Pengaruh Peningkatan Kinerja, Incoterms, Transportasi, Distribusi, Keterlibatan Tpldan Manajemen Risikoterhadap Aktivitas Logistik. Jurnal Sosial dan Teknologi, 2(3). doi:https://doi.org/10.59188/jurnalsostech.v2i3.304

Downloads

Published

2025-01-13

How to Cite

Wandana, Y. A., & Rahmawati, N. (2025). Analisis penyebab demurrage pada proses bongkar muat material impor proyek kapal x dengan metode six sigma DMAIC (Studi kasus: PT ABC). Jurnal Teknik Industri Terintegrasi (JUTIN), 8(1), 68–76. https://doi.org/10.31004/jutin.v8i1.38819

Issue

Section

Articles of Research