Penjadwalan Maintenance Mesin Jumbo Roll Tissue (JRT) Menggunakan Model Age Replacement

Authors

  • Dedi Dermawan Program Studi Teknik Industri, Fakultas Teknik,Universitas Muhammadiyah Riau
  • Faradila Ananda Yul Program Studi Teknik Industri, Fakultas Teknik,Universitas Muhammadiyah Riau
  • Muhammad Nurzen Program Studi Teknik Industri, Fakultas Teknik,Universitas Muhammadiyah Riau
  • Denur Denur Universitas Muhammadiyah Riau

DOI:

https://doi.org/10.31004/jutin.v7i3.30115

Keywords:

Maintenance, Age Replacement, Permesinan, Penjadwalan, Biaya

Abstract

PT. Pindo Deli Pulp and Paper Tbk is an industry in the field of paper and tissue production. The processing system is one of the factors influencing production results. Maintenance measures must be an important concern. Based on observations and looking at data on machine maintenance costs, it is known that the largest cost incurred by the company in carrying out JRT machine maintenance is IDR 256,000,000, which if it continues will be detrimental to the company. To minimize expenses and optimize component performance, it is necessary to analyze maintenance/replacement policies using the Age Replacement method. One component that is experiencing quite large costs is Unwinder 1, which will be determined by scheduling replacement and maintenance using Age Replacement. Based on the results of data processing using Age Replacement, a replacement schedule for Unwinder 1 components was obtained, namely 10 months with cost savings of IDR 248,444

References

Assauri, Sofyan.1993. “Manajemen Produksi dan Operasi”. Lembaga PenerbitFakultas Ekonomi Universitas Indonesia : Jakarta.

Dania, W.A.P, dkk. 2011. “Aplikasi Optimal Preventive Replacement Age Model Untuk Menentukan Jadwal Penggantian Komponen Dumping Grate pada MesinKetel Uap”.JurnalTeknologi Pertanian.Vol.12. No.1

Hutagaol, Henry Joy.2009. “Penerapan Total Produktive Maintenance untuk Meningkatkan Efisiensi Produksi dengan Menggunkan Metode OverallEquipment Effevtiveness di PT. Perkebunan Nusantara III Gunung Para”. Jardine, A.K.S. 1973. Maintanance, Replacement, and Reliability. Canada : Pitman Publishing

Widyaningsih, Sri Astuti.2011. “Perancangan Penjadwalan Pemeliharaan Pada Mesin Produksi Bahan Bangunan Untuk Meningkatkan Kehandalan Mesin Dengan Metode Reliability Centered Maintenance (RCM)”..

Downloads

Published

2024-07-10

How to Cite

Dermawan, D., Yul, F. A. ., Nurzen, M. ., & Denur, D. (2024). Penjadwalan Maintenance Mesin Jumbo Roll Tissue (JRT) Menggunakan Model Age Replacement . Jurnal Teknik Industri Terintegrasi (JUTIN), 7(3), 1627–1631. https://doi.org/10.31004/jutin.v7i3.30115

Issue

Section

Articles of Research