Optimasi Durasi Proyek dengan Penambahan Tenaga Kerja dan Jam Kerja Metode What If pada Proyek Pembangunan Gedung Soetandyo Universitas Airlangga

Authors

  • Arifa Mardiah Universitas 17 Agustus 1945 Surabaya
  • Hanie Teki Tjendani Universitas 17 agustus 1945 Surabaya

DOI:

https://doi.org/10.31004/jutin.v7i2.29356

Keywords:

Project delay, Critycal Path, What If Analysis

Abstract

Project delay is one of the impacts of decreased performance, and this can result in schedule setbacks and other forms of losses that will be experienced by service providers and service users. The purpose of this research is to find the optimum duration in accelerating the duration for delays of 10%-40%. In the Airlangga University Soetandyo Building Construction Project, there was a deviation in field realization progress of -9.210% and the cause of the initial delay was deep foundation work. What if is one method or strategy that can help project delay management by adding workers and increasing working hours on jobs in the critical path that are experiencing delays. As for the 10% delay, 78 additional workers and 19 additional working hours were obtained, for the 20% delay, 223 additional workers and 25 additional working hours were obtained, and for the 30% delay, 205 additional workers and 39 additional working hours were obtained

References

Alifen, R., & Sunarto, R. (1999). Analisa What If sebagai Metode Antisipasi Keterlambatan Durasi Proyek. Jurnal Teknik Sipil , 1, 103–113.

Budhy Prasetya, E. (n.d.). Aplikasi Manajemen Proyek Konstruksi Dengan Metode Critical Path dan Earned Value Management. 1(2).

Manoppo, S. S. M. Lengkong. F. J. M., & Dundu, A. K. T. (2022). Studi Keterlambatan Pelaksanaan Pekerjaan Konstruksi Di Kabupaten Minahasa Selatan. In Jurnal Ilmiah Media Engineering (Vol. 12, Issue 1).

Siregar, A. C., & Iffiginia, I. (2019). Penggunaan critical path method (CPM) untuk evaluasi waktu dan biaya pelaksanaan proyek. Teknika: Jurnal Sains Dan Teknologi, 15(2), 102. https://doi.org/10.36055/tjst.v15i2.6816

Soeharto, I. (1995). Manajemen Proyek dari Konseptual sampai Operasional. Erlangga.

Tjendani, H. T., & Ramadhan, K. (2022). CRITICAL PATH METHOD PADA PROYEK MYZE HOTEL SUMENEP UNTUK MENGENDALIKAN BIAYA DAN WAKTU. Jurnal Keilmuan Teknik Sipil, 5.

Downloads

Published

2024-04-22

How to Cite

Mardiah, A., & Tjendani, H. T. . (2024). Optimasi Durasi Proyek dengan Penambahan Tenaga Kerja dan Jam Kerja Metode What If pada Proyek Pembangunan Gedung Soetandyo Universitas Airlangga. Jurnal Teknik Industri Terintegrasi (JUTIN), 7(2), 1055–1059. https://doi.org/10.31004/jutin.v7i2.29356

Issue

Section

Articles of Research