Reliability Centered Maintenance (RCM) is a maintenance analysis method used to improve maintenance systems that focus on improving machine reliability. The problems that occur in the Wartsila machine at the Balipungut Duri Electricity Center is the frequent occurrence of machine failure that causes the low reliability of the machine. From the data of 2014-2016 years, a study of engine failure time in the line gas system that causes cessation of the machine. The study was carried out by FMEA treatment, damage rate and Weibull distribution data. The result of analysis shows that there is a critical component at Main gas admission valve that is at gas admission valve, admission valve filter and gas pipe feed. The rate of damage to the Main gas admission valve with the weibull distribution has a reduced rate of damage for b <1, of 0.010627 of this value can be known recommended treatment is Reactive / preventive maintenance and inpection maintenance.

References

Astuty, Rahma Anwar, N. H. (2018). ANALISIS BIAYA MANFAAT PEMBANGUNAN PLTMG PADA SISTEM KELISTRIKAN KEPULAUAN SELAYAR. PATRIA ARTHA Technological Journal •. https://doi.org/http://dx.doi.org/10.1897%2Fpatjou.v2i2.183

Cabot, R. C., Scully, R. E. M. D., Mark, E. J. M. D., McNeely, W. F. M. D., Ebeling, S. H., Phillips, L. D., … Ferry, J. A. (1997). Case records of the Massachusetts General Hospital: Case 31-1997. The New England Journal of Medicine. https://doi.org/10.../NEJM199706193362508

Dixon, R., & Smith, D. (1993). Strategic management accounting. Omega. https://doi.org/10.1016/0305-0483(93)90003-4

Evandro Tinoco Mesquita , Jaderson Socrates , Salvador Rassi, Humberto Villacorta, C. M. (2004). Insuficiencia Cardiaca com Função Sistólica Preservada. Arquivos Brasileiros de Cardiologia. https://doi.org/10.1590/S0066-782X2004000500014

Hendrik. (2011). A NALISIS PERAWATAN (MAINTENANCE) MESIN PEMBANGKIT LISTRIK TENAGA DIESEL (PLTD) PADA PT. PLN (PERSERO) CABANG RENGAT WILAYAH RIAU DI DESA KOTA LAMA KABUPATEN INHU. ANALISIS PERAWATAN (MAINTENANCE) MESIN PEMBANGKIT LISTRIK TENAGA DIESEL (PLTD) PADA PT. PLN (PERSERO) CABANG RENGAT WILAYAH RIAU DI DESA KOTA LAMA KABUPATEN INHU.

Naryono, Ir., L. B. (2013). Analisis Efisiensi Turbin Gas Terhadap Beban Operasi Pltgu Muara Tawar Blok 1. Sintek.

Rausand, M. (1998). Reliability centered maintenance. Reliability Engineering and System Safety. https://doi.org/10.1016/S0951-8320(98)83005-6

Siddiqui, A. W., & Ben-Daya, M. (2009). Reliability centered maintenance. In Handbook of Maintenance Management and Engineering. https://doi.org/10.1007/978-1-84882-472-0_16

Smith, M., & Thickitt, C. (2009). RCM letter to the editor. Rapid Communications in Mass Spectrometry. https://doi.org/10.1002/rcm.4196

Downloads

Published

2018-11-19

How to Cite

Sunaryo, S., Hakim, L., & Jumali, D. (2018). APLIKASI RELIABILITY CENTERED MAINTENANCE (RCM) PADA SISTEM SALURAN GAS MESIN WARTSILA. Jurnal Teknik Industri Terintegrasi (JUTIN), 1(2), 27–35. https://doi.org/10.31004/jutin.v1i2.220

Issue

Section

Articles of Research