PENERAPAN RELIABILITY CENTERED MAINTENANCE PADA PERALATAN SHIP UNLOADER PLTU TENAYAN 2 X 110 MW
DOI:
https://doi.org/10.31004/jutin.v3i2.1346Keywords:
Low Rank Coal, downtime, derating, ship unloader, Reliability Centered Maintenance.Abstract
Abstract The Tenayan Steam Power Plant (PLTU) is a fossil fuel power plant that is coal with a low rank coal type. To be able to meet the needs of electricity on the island of Sumatra, especially the Riau and Riau Islands, the Tenayan power plant must maintain coal needs within a safe range of 15-25 days of operation. Coal needs may not experience a decrease in productivity due to equipment damage. The obstacle that arises is the frequent occurrence of unexpected downtime which results in disrupted coal production so that the supply of coal is insufficient for the unit to operate so that the unit must be derating. This is caused by damage to one of the coal dismantling equipment, the ship unloader. This study aims to provide equipment maintenance and optimal inspection time intervals on ship unloader equipment. The research method used is Reliability Centered Maintenance (RCM) with quantitative analysis. After analysis, it was found that the critical component of the Tenayan PLTU ship unloader was the chain bucket. This is obtained based on the component with the most damage frequency, which is 16 damage over a 3-year period. From the results of data processing, the MTTR value is 62.72 hours and MTTF is 211.02 hours, while the optimal inspection time interval is 6 days, so it is recommended to do reactive, inspection, and preventive maintenance activities on the chain bucket periodically every 6 days in order to increase the reliability of the chain bucket.References
Yatin Ngadiyono, M.Pd. 2010. Pemeliharaan Mekanik Industri. Kementrian Pendidikan Nasional Universitas Negeri Yogyakarta Program Studi Pendidikan Teknik Mesin : Yogyakarta.
Ebeling Charles, 1997 An Introduction To Reliability And Maintenance Engineering. New York, USA: Waveled Press Inc.
John Moubray, 1994. Reliabilty-Centered Maintenance II, Butterworth-Heinemann.
Muhammad Faizal. 2016. Implementasi Reliability Centered Maintenance Pada Proses Peleburan Polimer Keramik di PT. Ferro Indonesia. Surabaya : Fakultas Teknologi Industri Institut Teknologi Sepuluh Nopember. [5] ATR Training Centre, 2008, ATR training manual ATA 70 powerplant, Toulouse, Airbus company
Alan Laksono. 2016. Penerapan Reliability Centered Maintenance pada Conveyor System PLTU Tenayan Pekanbaru : Fakultas Teknik Mesin Universitas Muhammadiyah Riau [7] ATR Training Centre, 2008, ATR training manual ATA 61 propeller, Toulouse, Airbus compan
Muhammad Amirul Ariffin. 2015. Penerapan Perawatan Berbasis Kehandalan (RCM) Pada Sistem Line Gas Mesin Wartsila. Pekanbaru : Fakultas Teknik Mesin Universitas Muhammadiyah Riau
Stamatis, D. H., 1995, Failure Mode and Effect Analysis (Milwaukee, WI: ASQC Quality Press).
SINTEF Technology and Society, 2009. Offshore Reliability Data (OREDA), 5th ed. Norway: Oreda Paticipants.
Wignjosoebroto, Sritomo, 2008. Ergonomi, Studi Gerak dan Waktu. Guna Widya. Jakarta.
Operator Produksi D, 2019. Handbook Operator Coal Handling. PLTU Tenayan : Pekanbaru.
Auditia Yudha Jiwantoro1, M. Adha Ilhami2, Evi Febianti3, 2017 Usulan Strategi Perawatan dengan Mempertimbangkan Reliability Block Diagram Pada Mesin Crane Ship Unloader
Ahmad Kholid Alghofari, Much. Djunaidi, Amin Fauzan, 2006 Perencanaan Pemeliharaan Mesin Ballmill dengan Basis RCM (Reliability Centered Maintenance, Vol 5.
Yogiadrian, 2011 Metode Reliability Centered Maintenance (RCM)
Akbar Prastiko, 2017 Laju Kegagalan dan Distribusi Laju Kegagalan