ANALISIS KEBIJAKAN DOKUMEN RKK PENAWARAN PADA PT X DENGAN MENGGUNAKAN SISTEM INTERNATIONAL SUSTAINABILITY RATING SYSTEMS (ISRS) SEBAGAI MENINGKATKAN KINERJA KESELAMATANKONSTRUKSI SUBCONTRACTOR

Authors

  • Sandhy Cahyadi Departemen Keselamatan dan Kesehatan Kerja, Fakultas Kesehatan Masyarakat, Universitas Indonesia
  • Baiduri Widanarko Departemen Keselamatan dan Kesehatan Kerja, Fakultas Kesehatan Masyarakat, Universitas Indonesia
  • Rossy Armyn Machfudiyanto Departemen Teknik Sipil, Fakultas Teknik, Universitas Indonesia

DOI:

https://doi.org/10.31004/prepotif.v6i3.8540

Keywords:

Process Safety Management, Subcontractors, construction safety performance, Prevention, Monitoring, Implementation and ISRS

Abstract

The root causes of most industrial accidents have been linked to process safety issues ranging from poor safety culture, lack of communication, asset integrity issues, lack of management leadership and human factors as well as inappropriate policies. This accident can be prevented with adequate application of process safety management (PSM). The process of selecting a Subcontractor, who will be appointed in a job, is the first step to run a company system as prevention, supervision, implementation and quality improvement in a job. In this research conducted by Delphi. This research was conducted from February 2022 to June 2022. Data collection techniques were through direct observation and review of company documents guided by RKK offers which will be analyzed according to the guidelines of the International Sustainable Rating System (ISRS). Another goal is that if this policy document is carried out in a more appropriate manner, then it is certain that it can improve the diving performance of subcontractor construction and from the government side so that the Ministry of Public Works and Public Housing can form an assessor team during the initial vendor selection inspection, and further develop the points which can cover to ensure that the subcontractor or vendor has carried out document policies in accordance with the rules of the applicable International Sustainability Rating System (ISRS). And for the company to be able to display an increase in construction safety performance.

References

Abdorrakhman, Gintings. Esensi Praktis Belajar dan Pembelajaran: Buah Batu Bandung tahun 2008.

Abdul-Rashid, I., Bassioni, H. and Bawazeer, F. (2007) “Factors Affecting Safety Performance in Large Construction Contractors in Egypt’’, Association of Researchers in Construction Management, ARCOM 2007 - Proceedings of the 23rd Annual Conference, 2(September), pp. 661–670.

Afandi, P. (2018). Manajemen Sumber Daya Manusia (Teori, Konsep dan Indikator). Riau: Zanafa Publishing.

Bird FE, Germain GL, Clark MD. Practical Loss Control Leadership. Atlanta, USA: International Loss Control Institute, Inc; 2003.

Boyd, Harper W. 2000. Manajemen Pemasaran “suatu pendekatan strategis dengan orientasi global”, Jakarta : Erlangga.

Cheng, C.-W., Yao, H.-Q., Wu, T.-C., 2013. Applying data mining techniques to analyze the causes of major occupational accidents in the petrochemical industry. J. Loss Prev. Process. Ind. 26, 1269–1278. https://doi.org/10.1016/j.jlp.2013.07.002.

Erivianto, W . I. 2002. Manajemen Proyek Konstruksi, Penerbit Andi, Yogyakarta.

Ervianto, W. I. 2002. Teori Aplikasi Manajemen Proyek Konstruksi, Andi, Yogyakarta.

EPSC, 2018. European Process Safety Centre - Objectives. http://epsc.be/Objectives.html.

Flippo, Edwin B. 1994. Personnel Management, 6th Edition. New York: McGraw-Hill.

Fahmi, Irham. (2014). Manajemen produksi dan Operasi. Bandung: Penerbit Alfabeta.

Gaol L, Jimmy. 2014. A to Z Human Capital : Manajemen Sumber Daya Manusia. PT. Grasindo : Jakarta.

George R.Terry,, dan Leslie.W.Rue, Dasar-Dasar Manajemen, alih bahasa, G.A. Ticoalu, Jakarta: Bina Aksara, 1988.

Hasting, A. J. dan Nicholas Hastings. 2010. Physical Asset Management. Queensland University of Technology.

Hastings, Nicholas A.J. 2010. Physical Asset Management. Springer: Australia.

Haapakorpi, A. (2011). Quality Assurance Processes in Finnish Universities: Direct and Indirect Outcomes and Organisational Conditions. Quality in Higher Education, 17(1), 69–81. https://doi.org/10.1080/13538322.2011.554311

Henderson A, et al. (2011) Dependence of proteasome processing rate on substrate unfolding. J Biol Chem 286(20):17495-502

Hendershot et al. Substance Abuse Treatment, Prevention, and Policy 2011, 6:17. http://www.substanceabusepolicy.com/content/6/1/17

Hsu, W.-K.K., Huang, S.-H.S., Yeh, R.-F.J., 2015. An assessment model of safety factors for product tankers in coastal shipping. Saf. Sci. 76, 74–81. https://doi.org/10.1016/j.ssci.2015.02.022.

ISO 9001: 2015. Quality Management.

ISO 14001:2015. Environmental Management.

ISO 45001:2018. Occupational Health and Safety.

ISRS International Sustainability Rating System, edition 8. 2009

Ismail, Z., Kong, K.K., Othman, S.Z., Law, K.H., Khoo, S.Y., Ong, Z.C., Shirazi, S.M., 2014. Evaluating accidents in the offshore drilling of petroleum: regional picture and reducing impact. Measurement 51, 18–33. https://doi.org/10.1016/j.

Lavelle, Derek et al. (2007). The Selection Of Subcontractors: Is Price The Major Factor?, School of the Built Environment Northumbria University.

Marwansyah, Manajemen Sumber Daya Manusia, Bandung: Alfabeta, 2010.

Masrukhin. (2015). Metode Penelitian Kualitatif. Kudus: Media Ilmu Press.

Messah, A. Y., Pono, D. R. R. & Krisnayanti, S. D., 2009. Dinamika TEKNIK SIPIL. Kajian Kriteria Pemilihan Subkontraktor Oleh Kontraktor Utama Menggunakan Metode Analytical Hierachy Process (AHP), p. 94.

Moeheriono, 2010, Pengukuran Kinerja Berbasis Kompetensi, Cetakan kedua, Ghalia Indonesia, Jakarta.

Mulyadi, D. 2015. Perilaku Organisasi dan Kepemimpinan Pelayanan. Bandung: Alfbeta

OECD Economic Surveys Indonesia. Survei Ekonomi OECD Indonesia 2015. www.oecd.org/eco/surveys/economic-surveyindonesia.htm -Diakses Oktober 2017

PP Nomor 22 Tahun 2020 Tentang Peraturan Pelaksanaan.

Peraturan Pemerintah Nomor 14 Tahun 2021 Tentang Perubahan PP Nomor 22 Tahun 2020 Tentang Peraturan Pelaksanaan.

Peraturan Presiden Nomor 12 Tahun 2021 Tentang Perubahan atas Perpres Nomor 16 Tahun 2018 Tentang Pengadaan Barang/Jasa Pemerintah.

Peraturan Menteri PUPR Nomor 10 Tahun 2021 Tentang Pedoman Sistem Manajemen Keselamatan Konstruksi.

Peraturan Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah Nomor 12 Tahun 2021 Tentang Pedoman Pelaksanaan Pengadaan Barang/Jasa Pemerintah Melalui Penyedia.

Peraturan Presiden Nomor 54 tahun 2010 tentang Pengadaan Barang / Jasa Pemerintah dan Peraturan Menteri Pekerjaan Umum tentang Pedoman Kualifikasi Pelanggan Nasional Pekerjaan Jasa Pelaksanaan Konstruksi (Pemborongan).

Sailendra, Annie. 2015. Langkah-Langkah Praktis Membuat SOP. Trans Idea Publising: Jogjakarta.

Sarno, Riyanarto. 2009. Audit Sistem & Teknologi Informasi. Surabaya: ITS Press.

Sarno, R. dan Iffano, I. 2009. Sistem Manajemen Keamanan Informasi. Surabaya: ITS Press.

Shiau, Yan-chyuan et al. 2006. Use Questionnaire And AHP Techniques To Develop Subcontractor Selection System, Journal Department of Construction Engineering Chung

Hua University.

Siagian, Sondang P. (2004). Manajemen Sumber Daya Manusia. Jakarta: Bumi Aksara

Siregar, Doli D. 2002. Optimalisasi Pemberdayaan Harta Kekayaan Negara: Peran Konsultan Penilai dalam Pemulihan Ekonomi Nasional.

Siregar, Doli D. 2004. Manajemen Aset. Satyatama Graha Tara.

Suprapto, Tommy (2009), Pengantar Teori dan Manajemen Komunikasi, Cet 1, Yogyakarta : Media Pressindo.

There are no sourc Theophilus, S.C., Nwankwo, C.D., Acquah-Andoh, E, Bassey, E, Umoren, U., 2018. Integrating human factor (HF) into a process safety management system (PSMS). Process Saf. Prog. 37, 67-85. https://doi.org/10.1002/prs.11909

Undang – Undang Nomor 2 tahun 2017 tentang Jasa Konstruksi.

Undang-Undang Nomor 11 Tahun 2020 Tentang Cipta Kerja.

UU Nomor 2 Tahun 2017 Tentang Jasa Konstruksi.

UU Nomor 2 Tahun 2017 Tentang Jasa Konstruksi.

Webb, D.J., Mohr, L.A. and Harris, K.E. (2008) A Re-Examination of Socially Responsible Consumption and Its Measurement. Journal of Business Research, 61,91-98. http://dx.doi.org/10.1016/j.jbusres.2007.05.007

William H. Newman, The Process of Management (London: Prentice Hall, Inc., 1961), p. 261.

Yousuf, Muhammad Imran (2007) "The Delphi Technique", Essays in Education: Vol. 20: Iss. 1, Article 8.

Downloads

Published

2023-12-20

How to Cite

Cahyadi, S., Widanarko, B. ., & Machfudiyanto, R. A. (2023). ANALISIS KEBIJAKAN DOKUMEN RKK PENAWARAN PADA PT X DENGAN MENGGUNAKAN SISTEM INTERNATIONAL SUSTAINABILITY RATING SYSTEMS (ISRS) SEBAGAI MENINGKATKAN KINERJA KESELAMATANKONSTRUKSI SUBCONTRACTOR. PREPOTIF : JURNAL KESEHATAN MASYARAKAT, 6(3), 1749–1767. https://doi.org/10.31004/prepotif.v6i3.8540