Wirawan, Bryan Eka, and Sutrisno Sutrisno. “Optimization of Job Shop Scheduling Using a Hybrid Active Non-Delay Scheduling Algorithm at PT Propan Raya”. Jurnal Teknik Industri Terintegrasi (JUTIN) 8, no. 4 (October 2, 2025): 4216–4223. Accessed December 5, 2025. https://journal.universitaspahlawan.ac.id/index.php/jutin/article/view/48582.