Riyanti, Popy Dian, and Amalia Amalia. “Setup Time Measurement on Flexo 4 Using The Single-Minute Exchange of Dies (SMED) Method in a Multi-Group Cardboard Production Setting”. Jurnal Teknik Industri Terintegrasi (JUTIN) 8, no. 2 (April 10, 2025): 2048–2058. Accessed December 5, 2025. https://journal.universitaspahlawan.ac.id/index.php/jutin/article/view/44790.