Wiranegara, Dimas Gusti, Gede Sarya, and Masca Indra Triana. “Earned Value Analysis Terhadap Biaya Dan Waktu Pada Proyek Pembangunan Gudang Produksi PP. Indopack Printing Nganjuk”. Jurnal Teknik Industri Terintegrasi (JUTIN) 7, no. 3 (July 10, 2024): 1673–1687. Accessed November 23, 2024. http://journal.universitaspahlawan.ac.id/index.php/jutin/article/view/31047.