[1]
P. D. Saputra and S. Hardini, “Penjadwalan Produksi Menggunakan Metode Economic Production Quantity (EPQ) (Studi Kasus: CV. Kopi Biji Palembang)”, JUTIN, vol. 8, no. 4, pp. 3954–3960, Oct. 2025.