[1]
B. E. Wirawan and S. Sutrisno, “Optimization of Job Shop Scheduling Using a Hybrid Active Non-Delay Scheduling Algorithm at PT Propan Raya”, JUTIN, vol. 8, no. 4, pp. 4216–4223, Oct. 2025.