[1]
P. D. Riyanti and A. Amalia, “Setup Time Measurement on Flexo 4 Using The Single-Minute Exchange of Dies (SMED) Method in a Multi-Group Cardboard Production Setting”, JUTIN, vol. 8, no. 2, pp. 2048–2058, Apr. 2025.