Riyanti, P. D. and Amalia, A. (2025) “Setup Time Measurement on Flexo 4 Using The Single-Minute Exchange of Dies (SMED) Method in a Multi-Group Cardboard Production Setting”, Jurnal Teknik Industri Terintegrasi (JUTIN), 8(2), pp. 2048–2058. doi: 10.31004/jutin.v8i2.44790.