Wirawan, B. E., & Sutrisno, S. (2025). Optimization of Job Shop Scheduling Using a Hybrid Active Non-Delay Scheduling Algorithm at PT Propan Raya. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(4), 4216–4223. https://doi.org/10.31004/jutin.v8i4.48582