(1)
Riyanti, P. D.; Amalia, A. Setup Time Measurement on Flexo 4 Using The Single-Minute Exchange of Dies (SMED) Method in a Multi-Group Cardboard Production Setting. JUTIN 2025, 8, 2048-2058.