[1]
yuniawati, R.D. 2026. Minimasi Defect pada Proses Loading-Unloading Galon Menggunakan Pendekatan Lean Manufacturing dan Value Stream Mapping. Jurnal Teknik Industri Terintegrasi (JUTIN). 9, 1 (Jan. 2026), 581–588. DOI:https://doi.org/10.31004/jutin.v9i1.53746.