[1]
Riyanti, P.D. and Amalia, A. 2025. Setup Time Measurement on Flexo 4 Using The Single-Minute Exchange of Dies (SMED) Method in a Multi-Group Cardboard Production Setting. Jurnal Teknik Industri Terintegrasi (JUTIN). 8, 2 (Apr. 2025), 2048–2058. DOI:https://doi.org/10.31004/jutin.v8i2.44790.