[1]
Abdullah, S.A. and Singgih, M. 2023. Analisa Percepatan Proyek Pembuatan Mesin Grinding Cat Dengan Time Cost Trade Off Method (Studi Kasus : PT TDI Sidoarjo) . Jurnal Teknik Industri Terintegrasi (JUTIN). 6, 3 (Jul. 2023), 438–447. DOI:https://doi.org/10.31004/jutin.v6i3.15772.