Analisis Efektivitas Program Preventive Maintenance Menggunakan Metode Total Productive Maintenance (TPM) di PT Sinar Sosro Cibitung
DOI:
https://doi.org/10.31004/jutin.v8i4.52029Keywords:
Preventive maintenance, TPM, OEE, Six Big Losses, Beverage industryAbstract
This study evaluates the effectiveness of the preventive maintenance program in the filling line of PT Sinar Sosro Cibitung by applying the Total Productive Maintenance (TPM) approach and measuring Overall Equipment Effectiveness (OEE). Data were collected through observations, interviews, and maintenance log documentation during September 2024. The analysis focused on three OEE components (availability, performance, and quality) and identification of the Six Big Losses. The results show that the average OEE value of the filling machine reached 92.0% (availability 94.3%; performance 98.5%; quality 99.3%), indicating performance above the world-class standard set by JIPM. The findings suggest strengthening the autonomous maintenance program and controlling production losses to ensure machine performance sustainability.References
Afifah, N., & Megantara, S. (2021). Analisis Overall Equipment Effectiveness (OEE) serta peningkatan produktivitas mesin pengemasan primer dengan pendekatan Total Productive Maintenance (TPM). Farmaka, 18(1), 53–59.
Agung, F. Y., & Siahaan, A. (2020). Overall Equipment Effectiveness (OEE) through Total Productive Maintenance (TPM) practices: A case study in chemical industry. Emerging Markets: Business Management Studies Journal, 7(1), 23–36. https://doi.org/10.33555/ijembm.v7i1.124
Altamirano, E., Caballero-Rojas, K., & Palacios-Aguilar, O. (2021). Total Productive Maintenance model applying SMED and FMEA to increase the overall efficiency of equipment (OEE) in the food sector. In Human Systems Engineering and Design: Future Trends and Applications (Vol. 21, Ihsed 2021). https://doi.org/10.54941/ahfe1001187
Biswas, J. (2024). Total Productive Maintenance: An in-depth review with a focus on Overall Equipment Effectiveness measurement. International Journal of Research in Industrial Engineering, 13(4), 376–383. https://doi.org/10.22105/riej.2024.453380.1436
BR, K. S., Alim, S., & W. K., R. W. K. (2023). Increasing OEE through six big losses analysis in the machining process of automotive company. Jurnal Ilmiah Global Education, 4(2), 594–602. https://doi.org/10.55681/jige.v4i2.756
Candra, N. E., Susilawati, A., Herisiswanto, & Setiady, W. (2017). Implementation of Total Productive Maintenance (TPM) to improve sheeter machine performance. MATEC Web of Conferences, 135, 1–11. https://doi.org/10.1051/matecconf/201713500028
Dewi, N. C., & Rinawati, D. I. (2016). Analisis penerapan Total Productive Maintenance (TPM) dengan perhitungan Overall Equipment Effectiveness (OEE) dan Six Big Losses mesin Cavitec PT. Essentra Surabaya (Studi kasus PT. Essentra). Industrial Engineering Online Journal, 4(4). https://ejournal3.undip.ac.id/index.php/ieoj/article/view/9868
Erwin Widodo, M. L. S. N. K., & Supriatna, A. (2020, July). Overall Equipment Effectiveness evaluation of maintenance strategies for rented equipment. International Journal of Technology, 11(3), 619–630. https://doi.org/10.14716/ijtech.v11i3.3579
Nursubiyantoro, E., Puryani, P., & Rozaq, M. I. (2016). Implementasi Total Productive Maintenance (TPM) dalam penerapan Overall Equipment Effectiveness (OEE). Opsi, 9(1), 24. https://doi.org/10.31315/opsi.v9i01.2169
Okpala, C., & Anozie, S. (2018). Overall equipment effectiveness and the six big losses in total productive maintenance. Journal of Scientific and Engineering Research, 5(4), 156–164.
Pinto, G., Silva, F. J. G., Baptista, A., Fernandes, N. O., Casais, R., & Carvalho, C. (2020). TPM implementation and maintenance strategic plan: A case study. Procedia Manufacturing, 51, 1423–1430. https://doi.org/10.1016/j.promfg.2020.10.198
Putra, R. D., & Daryanto, F. A. (2022). Analisis Six Big Losses untuk peningkatan nilai Overall Equipment Effectiveness (OEE) pada mesin produksi. Jurnal Teknik dan Sistem Industri, 11(1), 34–42.
Rakes, D., Arif, M., Setiawan, A., Nasution, K. P., & Prastyo, Y. (2024). Preventive maintenance on CNC machines using the OEE method to reduce downtime at PT. MTAT. Jurnal Impresi Indonesia, 3(7), 481–490. https://doi.org/10.58344/jii.v3i7.5116
Sayuti, M., Juliananda, Syarifuddin, & Fatimah. (2019). Analysis of the Overall Equipment Effectiveness (OEE) to minimize Six Big Losses of pulp machine: A case study in pulp and paper industries. IOP Conference Series: Materials Science and Engineering, 536(1). https://doi.org/10.1088/1757-899X/536/1/012061
Syahabuddin, A., Yusuf, M., & Zulziar, M. (2023). Analisis Total Productive Maintenance (TPM) dengan metode Overall Equipment Effectiveness (OEE) pada mesin ekstrusi di PT. Polymindo Permata. JITMI, 6(1), 2685–6123.
Uddin, M. A. (n.d.). Enhancing OEE as a key metric of TPM approach.
Wiyatno, T. N., Putra, F. E., & Khofiyah, N. A. (2025). Line Balancing Analysis Using the Rank Positional Weight Method to Improve OEE Value on the Machining Line in an Indonesian Automotive Company. International Journal of Technology & Energy, 3(1), 99-106.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Anita Purnamasari, Fibi Eko Putra, Retno Fitri Astuti

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

