Productivity, OEE (Overall Equipment Effectiveness), Strip Rotry engine

Abstract

PT. XYZ in the industrial world, increasing productivity and production efficiency is a key factor in achieving company goals, such as reducing defective products, and responding to increasingly stringent market demands. This study discusses the analysis of rotary strip machine productivity using the OEE (Overall Equipment Effectiveness) method which is used to measure the extent to which the rotary strip machine in the company works efficiently and effectively. Based on the results of data processing in this study, it can be concluded that the OEE calculation value obtained on the rotary strip machine at PT. XYZ with an average OEE value in October is 91% in November is 89%, and in December is 86%, in this value category according to JIMP the OEE value above 60% has met the standards set by the Japanese Institute of Plant Maintenance (JIPM) which is 85%. Soit can be considered to have a high effective value.

References

Agung, F. Y., & Siahaan, A. (2020). Overall Equipment Effectiveness (Oee) Through Total Productive Maintenance (Tpm) Practices: a Case Study in Chemical Industry. Emerging Markets : Business and Management Studies Journal, 7(1), 23–36. https://doi.org/10.33555/ijembm.v7i1.124

Akhir, T. (2022). Overall equipment effectiviness.

Alamsyah, F. (2015). Analisis Akar Penyebab Masalah Dalam Meningkatkan Overall Equipment Effectiveness (OEE) Mesin Stripping Hipack III dan Unimach di PT PFI. Jurnal OE, VII(3), 289–302.

Atikno, W., & Purba, H. H. (2021). Sistematika Tinjauan Literature Mengenai Overall Equipment Effectiveness (OEE) pada Industri Manufaktur dan Jasa. Journal of Industrial and Engineering System, 2(1), 29–39.

Daniel Kiptoo Arusei. (2020). TPM-based Focused Breakdown Reduction Strategy in Industry. International Journal of Engineering Research And, V9(07), 828–833. https://doi.org/10.17577/ijertv9is070317

Dewi, N. C. (2015). Analysis of the Application of Total Productive Maintenance (TPM) with the Calculation of Overall Equipment Effectiveness (OEE) and Six Big Losses Cavitec Machine PT. Essentra Surabaya. Industrial Engineering Online Journal, 4(4), 17.

Febryan, C., Luh, N., Lilis, P., Setiawati, S., Teknik, F., & Udayana, U. (2024). Jurnal Taguchi. 31–41.

Lestari, E. P., & Widjiningsih. (2015). Program studi pendidikan teknik mesin fakultas teknik universitas negeri yogyakarta 2015. Jurnal Fesyen: Pendidikan Dan Teknologi, 6(4), 1–15.

Lisdawati, E. (2015). LAPORAN PRAKTIK KERJA LAPANGAN PADA PT KIMIA FARMA, Tbk. 7–10.

Lubis, T. C., Pasaribu, F., & Tupti, Z. (2021). JURNAL 12.pdf. In Jurnal Akmamia Akuntansi, Manajemen, Ekonomi (Vol. 2, Issue 1). https://jurnal.ceredindonesia.or.id/index.php/akmami/article/view/126

Mu, A. (2010). r P Fo r R w On ly. International Journal of Production Research, 23(september), 1–36.

Mulyati, F. S., Septiadi, M. T., & Fauzi, M. (2022). Analisis Penerapan Total Productive Maintanance (Tpm) Dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) Di Pt Xyz. Jurnal Bayesian : Jurnal Ilmiah Statistika Dan Ekonometrika, 2(1), 75–81. https://doi.org/10.46306/bay.v2i1.30

Putri, A. A., & Widharto, Y. (n.d.). REDUCE WAKTU SETUP ( PERGANTIAN BATCH ) LINE 12 DENGAN MENGGUNAKAN METODE SINGLE MINUTE EXCHANGE OF DIES ( SMED ) DI PT XYZ.

Setiawan, R., Prasetyo, Z., Agustin, D. N., Ikmal Marhan, Z., & Setiawan, I. (2024). Aplikasi Metode Overall Equipment Effectiveness Di Industri Manufaktur: Literature Review. Jurnal Teknik Industri ITN Malang, September, 2615–3866.

SHELEMO, A. A. (2023). No Titleیلیب. Nucl. Phys., 13(1), 104–116.

Syahrully, R. M. (2019). Implementasitotal Productive Maintenance (Tpm) Dengan Metode Oee Pada Mesin Ncb 5 Produksi Dies Di Pt. Toyotamotor Manufacturingindonesia (Tmmin). 1–26.

Syaputra, M. J., Utomo, U., & Rimawan, E. (2020). Analisa Kinerja Mesin Kemas Primer, Dengan Metode Overall Equipment Effectiveness (Oee) Di Sebuah Industri Farmasi. Journal Industrial Servicess, 5(2), 220–223. https://doi.org/10.36055/jiss.v5i2.8003

Triwardani, D. H., Rahman, A., Farela, C., & Tantrika, M. (n.d.). ANALISIS OVERALL EQUIPMENT EFFECTIVENESS (OEE) DALAM MEMINIMALISI SIX BIG LOSSES PADA MESIN PRODUKSI DUAL FILTERS DD07 (Studi kasus : PT. Filtrona Indonesia, Surabaya, Jawa Timur) ANALYSIS OF OVERALL EQUIPMENT EFFECTIVENESS TO REDUCE SIX BIG LOSSES ON PRO. 07, 379–391.

Usulan Perancangan Formulit Pemeliharaan Mesin Duan KWEI di PT XYZ Menggunakan Metode Total Productive Maintenance ( TPM ) dan Overall Equipment Effectiveness ( OEE ). (2023). E-Proceeding of Engineering, 10(3), 3025–3034.

Downloads

Published

2025-10-20

How to Cite

Rizal, M., Sulistyowati, E., & Octavia, R. D. (2025). Analisis Pengukuran Produktivitas Overall Equipment Effevtiveness (OEE) pada Mesin Rotary di PT. XYZ. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(4), 4455–4463. https://doi.org/10.31004/jutin.v8i4.51442

Issue

Section

Articles of Research

Similar Articles

<< < 3 4 5 6 7 8 9 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>