Pemetaan Prioritas Risiko pada Proyek PT. ABC menggunakan Analytical Hierarchy Process

Authors

  • Richard Renaldy PT. Banggai Sentral Sulawesi, Sulawesi Tengah, Indonesia
  • Wildan Wildan Universitas Negeri Gorontalo
  • Alfikar Marpaung Universitas Negeri Gorontalo
  • Silvana Mohamad Universitas Negeri Gorontalo
  • Yusrin R Paudi Universitas Negeri Gorontalo

DOI:

https://doi.org/10.31004/jutin.v8i4.51019

Keywords:

AHP, Contractor, Risk Management, Renovation Project, Risk Priority

Abstract

PT. ABC, as a contractor engaged in renovation work, faces several operational constraints. This study focuses on determining the priority sequence of renovation project risks using the Analytical Hierarchy Process (AHP) approach. Data collection was conducted through interviews and distributed pairwise comparison questionnaires to experts. From the identification process, ten types of risks deemed critical were recorded. Based on AHP processing, the top three risks requiring attention are Inaccurate Budget Planning (33.12%), Surge in Material Prices (16.94%), and Errors in Material Specifications (14.42%). The Consistency Ratio (CR) value of 0.040 indicates that the assessments provided are consistent. The implication of this study emphasizes financial and technical-material aspects as the most urgent areas requiring immediate attention. The proposed recommendations include improving the cost estimation system and strengthening material supply governance. The results of this study are expected to serve as a reference in formulating mitigation strategies and resource allocation more effectively.

References

Anggraeni, D. P., & Prambodo, Y. L. (2024). Model Analytical Hierarchy Process (AHP) untuk Rekomendasi Smartphone Berdasarkan Preferensi Pengguna Gen Z. Jurnal Krisnadana, 4(1), 17–27. https://ejournal.sidyanusa.org/index.php/jkdn

Habsari, W., Djatna, T., Udin, F., & Arkeman, Y. (2022). A Multi-Criteria Decision-Making Approach Using Ahp for Pudak Packaging Supplier Selection. Jurnal Teknologi Industri Pertanian, 32(158), 197–203. https://doi.org/10.24961/j.tek.ind.pert.2022.32.2.197

Mohamad, S., Fais, M. A., Retno, D., Dewi, S., & Mulyono, J. (2025). Membangun Rantai Pasok Berkelanjutan Produk Ikan Bandeng untuk Menunjang Kelancaran Proses Transportasi. Widya Teknik, 24(1). https://doi.org/10.1093/benz/9780199773787.article.b00008186

Mohamad, S., Lahay, I. H., Lapai, Y., Fais, M. A., Prayogo, L. F., & Artikel, S. (2024). Pemodelan Supply Chain Resilience Risk Management Menggunakan Metode FMEA Berbasis Macroergonomic Analysis and Design INFORMASI ARTIKEL ABSTRAK. Jurnal INTECH Teknik Industri Universitas Serang Raya, 10(2), 113–120. http://dx.doi.org/10.30656/intech.v10i2.7896

Prasetyono, P. N., & Dani, H. (2022). Identifikasi Risiko pada Pekerjaan Proyek Konstruksi Bangunan Gedung sebagai Tempat Tinggal. Publikasi Riset Orientasi Teknik Sipil (Proteksi), 4(1), 42–47. https://doi.org/10.26740/proteksi.v4n1.p42-47

Umboh, A. H., Malingkas, G. Y., & Rumayar, A. L. E. (2021). Pemodelan Pengelolaan Risiko Proyek Konstruksi Oleh Perusahaan Pelaksana Konstruksi (Studi Kasus Proyek Konstruksi Di Pemerintah Daerah Kabupaten. Jurnal Ilmiah Media …, 11(2), 145–157.

Downloads

Published

2025-10-20

How to Cite

Renaldy, R., Wildan, W., Marpaung, A., Mohamad, S., & Paudi, Y. R. (2025). Pemetaan Prioritas Risiko pada Proyek PT. ABC menggunakan Analytical Hierarchy Process. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(4), 4388–4394. https://doi.org/10.31004/jutin.v8i4.51019