Jadwal Induk Produksi Thinner dengan Perhitungan RCCP Bill of Labor Approach dan Sistem Dinamis (Studi Kasus: Pabrik Produksi Thinner PT XY)
DOI:
https://doi.org/10.31004/jutin.v8i4.50566Keywords:
RCCP, Planning, Capacity, Dynamic SystemAbstract
PT. XY is one of the largest paint and coating material manufacturers in Asia. In addition to producing paint, the company also produces paint thinners. In its production process, the company faces difficulties in estimating the optimal production quantity for each period, often experiencing urgent processes, delivery delays, and even disruptions to the production process due to sudden schedule changes. This research will use the Exponential Smoothing forecasting method to predict demand in the coming period. A Master Production Schedule (MPS) calculation was also performed, which was then followed by RCCP. This method is used to compare production needs with the company's available capacity. The Master Production Schedule (MPS) that can be planned at PT. XY for 1 year from January 2025 – December 2025 is 7,926,032 Liters, produced by 32 people each month with a UPRT of 7,421,324 Liters and a Safety Stock of 33,025 Liters per month, with respective proportions of 61% IU products, 8% TIU products, and 31% SEMI products.References
Adhiana, T. P., Prakoso, I., & Pangestika, N. (2020). Evaluasi Kapasitas Produksi Ban Menggunakan Metode Rccp Dengan Pendekatan Bola. Jurnal Rekayasa Sistem Industri, 6(1), 6–12. https://doi.org/10.33884/jrsi.v6i1.2379
APRILIA, H. (2024). Dynamic Simulation of Rubber Production Systems Using Ssm and Vensim Approaches. INFOTECH Journal, 10(2), 306–316. https://doi.org/10.31949/infotech.v10i2.11432
Bellinda Ayustina, Arief Nurdini, & Ardhy Lazuardy. (2023). Perencanaan Jadwal Induk Produksi Pada Produk Tempe Di Rumah Tempe Indonesia. Jurnal Ilmiah Teknik, 2(1), 60–75. https://doi.org/10.56127/juit.v2i1.497
Donoriyanto, D. S., Rahmawati, N., & Indiyanto, R. (2023). Analisis Sistem Produksi Helm Pada Pt.X Dengan Pendekatan Sistem Dinamis. Tekmapro, 18(2), 95–106. https://doi.org/10.33005/tekmapro.v18i2.342
Hamirsa, M. H., & Rumita, R. (2022). Usulan Perencanaan Peramalan (Forecating) dan Safety Stock Persediaan Spare Part Busi Champion Type RA7YC-2 (EV-01/EW-01/2) Menggunakan metode Time Series Pada PT Triangle Motorindo Semarang. Industrial Engineering Online Journal, 11(1), 1–10. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/34373
Hidayat, T., Ulum, R. B., & Widarman, A. (2023). Rencanaan Kapasitas Produksi Pupuk Dengan Menggunakan Metode Rough Cut Capacity Planning (Rccp) Pada Pt.Pupuk Kujang. Jurnal Ilmiah Multidisiplin, 2(04), 153–161. https://doi.org/10.56127/jukim.v2i04.816
Ikhsan, M. R., & Tumanggor, A. (2020). Penerapan Metode Peramalan Sebagai Alat Bantu Untuk Menentukan Perencanaan Produksi Pada Percetakan Surat Kabar. Journal of Industrial Engineering and Operation Management, 3(1), 19–23. https://doi.org/10.31602/jieom.v3i1.3311
Meirizha, S. N., & Syukur, E. (2020). Kelayakan Kapasitas Produksi Dengan Metode Rough Cut Capacity (RCCP) Di Seksi Ppm#6, PT. Indah Kiat Pulp And Paper, Tbk. Jurnal Surya Teknika, 6(1), 1–7. https://doi.org/10.37859/jst.v6i1.1855
Sari, S., Pitaloka, D. A., Hergiyan, S., Siburian, B., & Yordan, I. B. P. (2022). Analisis Metode Agregat Planning untuk Minimasi Biaya pada UMKM Makmur Jaya-Jakarta. JT : Jurnal Teknik, 11(2), 59–68. http://jurnal.umt.ac.id/index.php/jt/index
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Asep Ramdan, Asep Hermawan, Dedy Setyo Oetomo

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

